🔥 Beautiful Fireplace Transformation Completed ✨We’re thrilled to share this latest project for one of our valued custom...
25/05/2026

🔥 Beautiful Fireplace Transformation Completed ✨

We’re thrilled to share this latest project for one of our valued customers at Edwards Developments Ltd!

Before – The original ornate fireplace, beautifully dressed with candles and lighting. A classic look, but the client wanted a fresher, more characterful update.

During – Stripping it all back! We carefully removed the old surround, exposed the original brickwork, and installed this stunning solid oak beam.

After – The finished result! The natural oak beam now sits perfectly above the exposed stonework, creating a lighter, warmer and more modern focal point in the living room.
We love how this transformation has completely lifted the space while keeping that cosy, homely feel.

Another happy customer! ❤️

Would you go for the natural oak & exposed stone style, or prefer something more traditional and ornate? Let us know in the comments!

Proudly delivered by Edwards Developments Ltd
renovations | Extensions | Bespoke finishes

25/05/2026
🏗️ Week 7 Update – Roof Fully Complete!What a week! ✅The new extension roof is now fully tiled and finished, it looks fa...
25/05/2026

🏗️ Week 7 Update – Roof Fully Complete!
What a week! ✅

The new extension roof is now fully tiled and finished, it looks fantastic and perfectly matches the existing house.

The transformation from the front is really starting to impress!

Scaffold will be dismantled next week, which is always another big milestone.

Inside, the floor structure is progressing well with new joists now in place.

Can’t wait to see the difference once the scaffold comes down, Week 8 is going to look very different!

Huge thanks to the team for their continued hard work.

🏗️ Weeks 5 & 6 Update – Roof is Tiled & Major Internal Works Done!We’ve had two very productive weeks on site! ✅The new ...
13/05/2026

🏗️ Weeks 5 & 6 Update – Roof is Tiled & Major Internal Works Done!

We’ve had two very productive weeks on site! ✅

The new extension roof is now fully tiled and looking fantastic, it blends beautifully with the existing house and has completely transformed the front elevation.

Inside, we’ve carried out full demolition of the old kitchen and W.C., removed the old floor, installed a new steel beam (RSJ), and the new floor joists are now in place.

A big thank you to the whole team for their hard work through these busy weeks, More updates coming soon.

🚐✨ Huge thanks to the team at CV Graphics for the incredible vehicle wrap work! 🙌🏻Absolutely love how sharp these latest...
07/05/2026

🚐✨ Huge thanks to the team at CV Graphics for the incredible vehicle wrap work! 🙌🏻
Absolutely love how sharp these latest designs turned out all designed and installed in-house. Top quality as always.
Appreciate the business and the awesome results!
Give them a follow and check out their work 👉 (or visit cvgraphics.co.uk)

Some of our latest vehicle graphics, all designed and installed in house 🙌🏻
Thank you for the business Edwards Developments; give them a follow!
Need to spruce up your van? Contact us for details ➡️ cvgraphics.co.uk

🏗️ Week 4 Update – Big Progress Inside & Out!Another strong week on site! ✅We’ve carried out the full internal demolitio...
05/05/2026

🏗️ Week 4 Update – Big Progress Inside & Out!
Another strong week on site! ✅

We’ve carried out the full internal demolition of the existing kitchen and W.C., opening up the space ready for the new layout.

At the same time, the new roof rafters have been fully installed across the extension, giving us a clear view of the new roofline.

The structure is really coming together now, and it’s starting to feel like a proper transformation.

Huge credit to the team for pushing through both the external roof work and the internal demo so efficiently.

Next steps are to have all the brickwork built up & start with the knock through. Watch this space!

🏗️ Week 3 Update – Scaffold is UP!Great progress on site this week! The extension is really starting to take shape, and ...
25/04/2026

🏗️ Week 3 Update – Scaffold is UP!

Great progress on site this week! The extension is really starting to take shape, and we’ve now got the full scaffolding erected and fully secured, ready for the roof installation to begin.

It’s always a big milestone seeing the scaffold go up, suddenly you can really visualise the new roofline and how it’s all going to look when it’s finished.

The team has been working hard on the brickwork and structural elements, and we’re all set for the Joiners to get started next week. Exciting times ahead!

18/04/2026

🏗️ Flying Through Week 2

🏗️ Flying Through Week 2!Things are moving fast at our Oak Tree Meadow project! The Edwards Developments team has been a...
18/04/2026

🏗️ Flying Through Week 2!

Things are moving fast at our Oak Tree Meadow project! The Edwards Developments team has been absolutely smashing it this week.

As you can see from the photos, we’ve made a massive dent in the groundworks and the new walls are already starting to climb.

A huge shoutout to the lads on site, their pace and quality are top-tier. We’re excited to keep this momentum going as we head into Week 3!

Stay tuned for more updates as this home gets its fresh new look. 🧱✨

15/04/2026

CUSTOMER NOTICE – PLEASE TAKE A READ:

Following on from our previous video, we previously announced that Thursday 30th April would be our final working day before transitioning into full-time self-employment with RC Van Locks.

However, due to a change in circumstances, we are now pleased to confirm that this transition will be happening sooner than planned.

As of tomorrow (16.04.2026), RC Van Locks will officially be operating full time.

This means increased availability for our customers, with our diary now open Monday to Friday and Limited weekend appointments still available!

If you’ve been considering upgrading your van security, now is the perfect time to get booked in.

At RC Van Locks, we supply and professionally install a wide range of high-quality van security products designed to keep your van, tools, and business safe from becoming the next target.



🔐 Our Security Solutions Include:

🔲 Hook Locks
🔲 Slam Locks
🔲 Statement Locks
🔲 Rep Locks
🔲 Anti-Drill Shields
🔲 Anti-Peel Kits
🔲 Loom Guards
🔲 Handle Shields
🔲 OBD Port Protectors
🔲 Roof Bars
🔲 Roof Racks
🔲 Rear Bumper Steps

…and much more!

Whether you’re a sole trader or managing a full fleet, we’ve got security solutions tailored to your needs.



🧰 Why Choose RC Van Locks?

✔ Over 7 years of hands-on experience
✔ Yorkshire based
✔ Approved, fully mobile service
✔ Fleet work & sole traders welcome
✔ Full invoice provided on completion

We pride ourselves on reliable workmanship, quality products, and protecting what matters most to you.



📞 Get in Touch for a Free Quote:

📧 [email protected]
📞 07803 535922
💻 RC Van Locks (click the link below)
🔗 https://share.google/pSTgpP8fTKbDHcrZl

Or simply send us a message on Facebook!



Don’t wait until it’s too late — upgrade your van security today.

Thank you for supporting us 🙌

RC VAN LOCKS 🔐🚛

Address

Kendall Court
Ossett
WF59FE

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Edwards Developments posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Edwards Developments:

Share

Category