Full Bathroom & Shower Room Refurbishment 🚿✨
Throwing it back to a project we wrapped up a couple of weeks ago. This was a complete top-to-bottom transformation, taking a tired space right back to the studs and rebuilding it into a modern, sleek shower room.
Here is a look at the step-by-step progress of the transformation:
The Rip-Out & Prep: We stripped the space completely down to the bare walls to map out the new plumbing and structural layout.
First Fix & Enclosure Base: We got the new low-profile shower tray set perfectly and began boarding out the walls.
Precision Tiling: Next up was the tiling. The client chose a stunning dark, stone-effect tile. We used a precise leveling system to ensure a flawless, dead-flat finish on the back wall before wrapping it cleanly into the corner.
Joinery & Second Fix: With the tiling sorted, we installed the new toilet and basin, cleanly boxing in all the raw pipework with bespoke timber casings.
Flooring & Custom Framing: We laid down the fresh striped flooring and built a solid, custom timber support frame for the bath panel setup.
The Finished Result: We added the final touch to the enclosure with a sleek, chrome-framed sliding glass shower door.
From structural timber work and boxing-in to plumbing and high-end tiling, D&G Joinery and Construction handles the entire project from start to finish.