08/05/2026
LOFT CONVERSION π‘ - Completed.
The final stages completed ready for the decorator to make this space complete.
Creting a master bedroom and office/spare bedroom/wardrobe space.
β
New understairs cupboard storage.
β
Oak and painted staircase ready for stair carpet runner.
β
Oak π₯ rated sliding πͺ.
β
Large Velux windows with light block blinds.
β
Engineered oak flooring throughout.
β
Full compliant insulation throughout.
β
New lights, power, solar generation and high speed internet connection.
β
Storage cupboards to take advantage of dead space.
β
Fully plastered.
β
Torus skirting throughout.
thanks for the wood. general building materials.
engineered oak flooring.
for the quality roof windows.