Hydroblast UK

Call Directions Website

Hydroblast UK Experts in the field of high pressure water jetting equipment and Robotic Hydrodemolition.

Services include water jet cleaning, concrete cutting,sales, rental, servicing and training. Services include water jet cleaning, concrete cutting, sales, rental, servicing and training.

13/10/2026

See line removal in action. 💦

Work completed on the 2nd of October over in Northampton.

Another job well done by the Hydroblast team!

Refractory removal completed in Port Talbot ✅Our team carried out the works during a night shift on 18th August, using t...
07/10/2026

Refractory removal completed in Port Talbot ✅

Our team carried out the works during a night shift on 18th August, using the Aqua 14 UHP unit to deliver precise, controlled removal in a challenging working environment.

The job was completed in a single night shift, keeping the programme moving with minimal disruption.

A customer recently attended WJA training at Gatenby, with IMS also on site with their specialist robot.To support the t...
05/10/2026

A customer recently attended WJA training at Gatenby, with IMS also on site with their specialist robot.

To support the training and their upcoming work, one of our Aqua 14 UHP pumps has been hired out for three weeks alongside the IMS robot.

Another great example of our specialist water jetting equipment being put to work in real-world applications.

Need equipment for your next project? Get in touch with the Hydroblast team.

02/10/2026

Recently over in Ireland we carried out hydrodemolition works using both our HP and UHP units across a two-week project 💦

What started as a pump hire developed into a more hands-on collaboration, with Hydroblast also supplying an operative to help carry out the works.

Several beams required hydrodemolition, with the video showing what removal was required.

Hydrodemolition in action in London 💦Our team carried out careful thrust block concrete removal around a live water main...
01/10/2026

Hydrodemolition in action in London 💦

Our team carried out careful thrust block concrete removal around a live water main, using the Aqua 14 at 2,800 bar for precise, controlled removal in a tight working area.

A vac ex was used to assist the speed of concrete removal.

29/09/2026

Wait for it… 👀

Our team recently took on a night-shift refractory removal job, putting our Aqua 14 UHP unit to work to strip away the refractory material using ultra-high-pressure water jetting.

The job was completed in a single shift, and this footage takes you right up close to the action as our operative works through the removal. Although, as you’ll see, that clear view doesn’t last long… 💨

23/09/2026

Ever seen an Aqua 14 / S1400 on a lift? Well, now you have! 👀💦

Our team has recently been over in Ireland carrying out hydrodemolition works across a two-week project, putting both our HP and UHP units through their paces.

With the job requiring access at height, the Aqua 14 / S1400 had to take a slightly different route to the work area! 💪

Another great example of the versatility of our hire fleet and the lengths we’ll go to get the right equipment exactly where it’s needed.

Need HP or UHP equipment for an upcoming project? Get in touch with the Hydroblast team.

22/09/2026

Getting stuck in with the tank clean in Croydon. 💪💧

A look inside the tank as the Hydroblast team worked to remove built-up waste and contamination, helping bring it back to a clean, usable condition.

This job was completed from 20th–21st August.

🌐 www.hydroblast.co.uk

Here’s a tank cleaning before and after from a recent job in Croydon, completed from 20th–21st August. 💧Built-up waste a...
16/09/2026

Here’s a tank cleaning before and after from a recent job in Croydon, completed from 20th–21st August. 💧

Built-up waste and contamination was removed, helping restore the tank’s capacity and leaving the internal surfaces clean and clear.

Need your tank cleaned? Speak to the Hydroblast team today.

🌐 www.hydroblast.co.uk

09/09/2026

Here’s one of our recent hydrodem jobs in action 💦

Using our Aqua 14 at 2,800 bar, the team carried out controlled concrete removal around a live water main in London, working carefully in a tight and challenging area.

Precision, power and the right equipment for the job.

Address

Old Hall Farm, Gatenby
Northallerton
DL79PG

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm

Telephone

+441677428786

Alerts

Be the first to know and let us send you an email when Hydroblast UK posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share