Middle floor 156m of coving fitted.Every room on this floor is now 1st coated.Please bear in mind an interior designer h...
12/06/2026

Middle floor 156m of coving fitted.

Every room on this floor is now 1st coated.

Please bear in mind an interior designer has choosen the colour schemes and fixtures amd fittings and tiles etc for the customer although we may not agree with them were paid to do as were told.

Kitchem floor ripped out dropped by 50mm and underfloor heating added reason for 50mm drop to ensure a seemless finish into lounge area omce brickett style floor is fitted.

Roof ridges starting to finally go on rest if lead around new chimney tided up and finshed off.

Floor tiled and shower room tiled, Middle floor 1st coat walls and celings going on ready for coving to be cut and fitte...
05/06/2026

Floor tiled and shower room tiled,

Middle floor 1st coat walls and celings going on ready for coving to be cut and fitted early week.

Ground floor mist coat going on

Two orginal fire places and surrounds brought back to life and orgibal built in cuboarda refreshed

Lead apron and flashing going on chimney ready for liner to be dropped in for log burner then cap and pot the top.

The compleation daye is edging ever closer some long days and nights ahead for me and the boys.

Quick update been very busy, family bathroom all baorded floor down plastered tiles starting go on shower area as u can ...
29/05/2026

Quick update been very busy, family bathroom all baorded floor down plastered tiles starting go on shower area as u can see from pic lovely square room.

Middle floor floorboards first few passes with sander customer has stated they don't want perfection they want some character left in the baords.

Skirting and architraves going on middle floor

Top floor hallway and stairs one coated waiting for desicion on handrail to finsih off up there

Then we can fit the bathroom early week and update the actual before work pics and final result on that floor,

Kitchen floor ripped out ready to install lowered floor joist and underfloor heating to ensure a seemless finish btween the two rooms

Weekly update All the top floor first coated customer wanted woodwork celings and walls all the same colour so we went w...
15/05/2026

Weekly update

All the top floor first coated customer wanted woodwork celings and walls all the same colour so we went with a diamond egg shell wasnt sure on the colour splash everywhere but its grown on me.

Then some absolute artwork of copper for the family bathroom creating an isolation center for both floors and the 4 bathrooms it feeds which will be hidden behind wall with access panel. All plumbing now for both floors dropped through to ground floor.

Ar plastering smashing the ground floor plastering out for us,

12/05/2026
Weekly update, Shower tiled some extremely weird angles to get round and grout going onFloor starting to be tiled Skirti...
08/05/2026

Weekly update,

Shower tiled some extremely weird angles to get round and grout going on

Floor starting to be tiled

Skirting and new arctrave top floor done and caulked and filled ready for rub back

Upper rooms some imperfections filled ready to sand back

Windows all trimmed up and finshed off with wooden surrounds

Bottom floor plasterboards going on walls being prepped for plastering next week

Outside bases set out the back ready to concrete for new patio

Front of roof going on nicely

Ready get some top coat paint on next week rest bathroom fitted and start the ground fllor pipe work and under floor heating.

Couple of small cedar wood shingle porches re done the old ones had out lived there lifespan became rotten and degrading...
07/05/2026

Couple of small cedar wood shingle porches re done the old ones had out lived there lifespan became rotten and degrading, really fun to use something different from everyday both porches brought back to life,

Another chimey down and re tiled, also while up there we fitted a dry ridge system to the roof after discussions with th...
07/05/2026

Another chimey down and re tiled, also while up there we fitted a dry ridge system to the roof after discussions with the customer.

Small repair squeezed in, felt degraded heavy rain fall allowing water ingress in through the eaves carried out a temp r...
04/05/2026

Small repair squeezed in, felt degraded heavy rain fall allowing water ingress in through the eaves carried out a temp repair for now and re do entire roof later on in the year.

Little chimney re flaunch and clean up squeezed in during a crazy week.
02/05/2026

Little chimney re flaunch and clean up squeezed in during a crazy week.

Address

Newport

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Wight Roofing & building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Wight Roofing & building:

Share