20/06/2026
This weeks work all wrapped up ,
A supporting wall removed RSJ installed and signed off by building control boarded and plastered where needed ready for the kitchen install by inspired installations .
A kitchen in West Denton this one little bit more work than I thought,
We thought it would be a normal overskim ,
But on arrival I noticed some artex peeling away in the corner , started scraping it back till the full ceiling was on the floor ๐,
Current boards were in good condition though so straightforward plaster after a good tidy up , ready for kitchen install now ๐๐ป,
A ceiling plastered in Wallsend
A ceiling repair where the old loft hatch used to be boarded and plastered
And a Door way opening in Whitley bay ,
And that is an average working week for us ,
No job too big or small
Any needed a quote just messege or call me and Iโll be with you as soon as I can ๐๐ป