DOUBLE STOREY EXTENSION UPDATE - FOREST HALL.Two roofs cut back and stripped off today ✅Membrane put on to stop any pene...
07/09/2026

DOUBLE STOREY EXTENSION UPDATE - FOREST HALL.

Two roofs cut back and stripped off today ✅
Membrane put on to stop any penetrating water getting into ceilings ✅
Taped down and latted to make it watertight ✅
Pebble dash took off above the roof ✅
Electrics all taped up individually and bagged up and then re-taped again to make them watertight to stop any tripping ✅

All ready to start building upper floor now.

What a mess it is underneath the roof.

Plumbing pipes all over like a roller coaster up and down.

Plasterboards just hidding in roof smashed in pieces.

Chimney stack not structured or supported correctly it has a big hole in it so could capsize.

Other internal walls coming up through the ceiling and supporting on roof joists.

Stack soil/ drainage pipe hidding in the ceiling and just left so odours are travelling around in the ceiling instead of the stack pipe/flue coming through the roof to prevent any smells/odours.

Everythings just been hidding inside of the sloped roof and put in anyway possible.

Not what we wanted to come across as extra work for us to put in but dont know what your going to come across until its been exposed as this should of just been a nice easy take off but nothing my lads cant sort out and get over. A-Team, Proper Grafters 👌💯

We will find the upper floor heights tomorrow, to see where the new floor joists are sitting and cut out internal door way if possible (depensing on measurements) and then get padstone and steels inserted 😀

Flying on this one project we are.

NTL Brickwork & Building Services ⭐⭐⭐⭐⭐

BLOCKWALL all done and dusted yesterday in FENHAM Trench all dug out ✅Foundation all levelled out ✅concrete foundation p...
06/09/2026

BLOCKWALL all done and dusted yesterday in FENHAM

Trench all dug out ✅
Foundation all levelled out ✅
concrete foundation poured ✅
Blockwork wall all built up ✅

All ready to be timber framed out and new latted fence put on top of the wall and driveway to be installed.

NTL Brickwork & Building Services 🧱🧱🧱

Please get in touch for a free no obligation quote ⭐⭐⭐⭐⭐

Kitchen extension at Forest Hall all wrapped up to wall plate height and ready for roof to go on.Moving on to the upper ...
03/09/2026

Kitchen extension at Forest Hall all wrapped up to wall plate height and ready for roof to go on.

Moving on to the upper rear extension once padstones and steels have been inserted next week.

Job is flying. Progress photos below 🧱🧱🧱

NTL Brickwork & Building Services
⭐⭐⭐⭐⭐

DOUBLE STOREY KITCHEN AND REAR EXTENSION UPDATEThe lads have been busy on this one whilst i was on holiday last week. Ai...
02/09/2026

DOUBLE STOREY KITCHEN AND REAR EXTENSION UPDATE

The lads have been busy on this one whilst i was on holiday last week.

Aitting eoom door boarded uo for dust 👍
Walls stripped back to brick ✅
Internal foundation put in for internal wall ✅
New internal wall built in kitchen ✅
Starter bars on each side of new wall ✅
Stell fixing in on parrty wall and new cavity internal wall✅
Insulation all put on ✅
Windows stripped out for kitchen to be opened up ✅
Acro props put in ✅
Knock through all done ✅
All electric wires in the kitchen took out, cut back and taped up ✅

NTL Brickwork & Building Services 🧱🧱🧱

Please get intouch for a free no obligation quote ⭐⭐⭐⭐⭐


SELF BUILD UPDATE - porchway all finished off. Ready to stsrt stripping scaffold abd starting getting the windows/ doors...
02/09/2026

SELF BUILD UPDATE - porchway all finished off. Ready to stsrt stripping scaffold abd starting getting the windows/ doors and a big glass front in 👌💯 NICE, NEAT, TIDY BUILD.

Blockwork all up ✅
Cavity needs insulated and closed off ✅
Ready for cladding sides panels to be put on ✅ apex roof to go on front glass porchway to blend in with new roof above ✅



NTL Brickwork & Building Services 🧱🧱🧱

Feel free to get t intouch for a free no obligation quote ⭐⭐⭐⭐⭐

FOREST HALL JOB coming on nicely. Kitchen all ripped out ✅Plumbing pipes and boiler all taking out ready to run new pipe...
18/08/2026

FOREST HALL JOB coming on nicely.

Kitchen all ripped out ✅
Plumbing pipes and boiler all taking out ready to run new pipe work for new kitchen and raidiators and taps ✅
Flooring all taking up and now back to a basic concrete pad ✅

Knock through is getting done this week too 🧱



fans Everyone Active

NTL Brickwork & Building Services
⭐⭐⭐⭐⭐

SELF BUILD UPDATE scaffold dropped and altered for the front glass porch way to be built - (top to bottom) ✅Site all tid...
12/08/2026

SELF BUILD UPDATE

scaffold dropped and altered for the front glass porch way to be built - (top to bottom) ✅
Site all tidied up and rubbish removed ✅
Fascias and dry verge all put on ✅
Stud walls started to go in ✅

Starting to great shape now camt wait to see it all finished now 🧱🧱🧱

Please dont hesistate to get intouch for a free no obligation quote

⭐⭐⭐⭐⭐

FOREST HALL UPDATE.blockwork all up on neighbours elevation ✅Internal plastic damp membrane put in ✅Plastic membrane all...
12/08/2026

FOREST HALL UPDATE.

blockwork all up on neighbours elevation ✅
Internal plastic damp membrane put in ✅
Plastic membrane all lapped up and taped up ✅
Dolomite put in and levelled out ✅
Nice clean manhole ready to be conncted once the shells all up and water tight ✅

Waiting for steels to arrive now so we can start building the upper extension 😀

Flying up it is 🧱🧱🧱



fans Everyone Active

FOREST HALL UPDATE - Double Storey ExtensionLintels on ✅Damps set above openings ✅Weepholes put in ✅Two course of blockw...
06/08/2026

FOREST HALL UPDATE - Double Storey Extension

Lintels on ✅
Damps set above openings ✅
Weepholes put in ✅
Two course of blockwork over the lintels ✅

Lower Kitchen/Dining Room extension nearly complete now just got the back part to do over the lintels tomorrow 🧱🧱🧱

Flying we are all up from foundations to wall plate in 5 days, missed a few day due to weather permitted 👌💯

Foundations all in and upto DPC height, double skin blockwork all, insulation all in, damps all in (internal and external) and weepholes all put in



fans Everyone Active

SELF BUILD UPDATE 👌💯Peaks all up to roof height now ✅ Just have all the triangle cuts up the side need to go in now then...
05/08/2026

SELF BUILD UPDATE 👌💯

Peaks all up to roof height now ✅

Just have all the triangle cuts up the side need to go in now then a dry verge put on then thats the house all water tight.

Then after that all windows and doors and full front glass planel need to go in then house it pratically there apart from the internal works that need put in too.

All upper flooring put in today. Bonded, glued and screwed down ✅

Left out the hole for staircase to be put just need joist cut out to create the opening

House has all been passed externally from building control ✅

Now we can concentrate on getting the DOUBLE EXTENSION completed at FOREST HALL from now on 😀

Please like, share and follow my page for more updates on our projects



NTL Brickwork & Building Services 🧱🧱🧱

⭐⭐⭐⭐⭐ 5 Star Quality Everytime.

Address

Newcastle Upon Tyne

Website

Alerts

Be the first to know and let us send you an email when NTL Brickwork & Building Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to NTL Brickwork & Building Services:

Shortcuts

Share

Category