CT Sparks

CT Sparks Niceic Approved Contractor, Niceic Domestic Installer
Electrical installation condition reports. Free Visual inspections

https://www.facebook.com/share/16kB8RUqne/?mibextid=wwXIfr
11/12/2025

https://www.facebook.com/share/16kB8RUqne/?mibextid=wwXIfr

*Urgent Safety Notice: Action Required for Haier Heat Pump Tumble Dryers*

We have been made aware of a fault affecting Haier Heat Pump Tumble Dryers

Haier has resumed its corrective action programme after updating the modification. Repairs are now being arranged for the remaining 85,000 affected machines.

Affected Brands:
Baumatic https://service.baumatic.co.uk/product-safety-issue/,
Candy https://www.candy-home.com/en_GB/product-safety-issue/, Caple https://www.caple.co.uk/support/urgent-safety-notice/urgent-safety-notice-2/,
Haier https://www.haier-europe.com/en_GB/pages/product-safety-issue,
Hoover https://www.hoover-home.com/en_GB/pages/product-safety-issue,
Iberna https://productsafety.haier.co.uk/,
Lamona https://www.howdens.com/help-and-advice/aftersales/product-safety-notices-and-recalls,
Montpellier https://www.montpellier-appliances.com/product-safety/

Action Required:
• Stop using the appliance immediately and unplug it if possible.
• Check the model and serial number online using the official links below.
• Contact the manufacturer to arrange a repair.

Spread the cost with Klarna on all Invoices
02/05/2025

Spread the cost with Klarna on all Invoices

Some of the awesome installations we have carried out over the last few weeks.
09/10/2022

Some of the awesome installations we have carried out over the last few weeks.

Some of the installations we’ve done over the last month. Lots of battery storage.
10/07/2022

Some of the installations we’ve done over the last month. Lots of battery storage.

Yet Another solar PV array installed, All cables tidy as they should be
18/05/2022

Yet Another solar PV array installed, All cables tidy as they should be

A recent Roof Installation with a custom system design, This is how the underneath of the system should look all cables ...
10/05/2022

A recent Roof Installation with a custom system design, This is how the underneath of the system should look all cables neat and tidy

PV and battery storage Installations are on the up there’s a lot of quality installations going In but There are a lot o...
10/04/2022

PV and battery storage Installations are on the up there’s a lot of quality installations going In but There are a lot of companies installing systems like this and it’s not ok. Yet another poorly installed system we have been asked to look at installed in a cupboard to small and Dangerously close to the gas supply meter, these batteries should not just be placed on the floor they should to be rack mounted, Earthed correctly, The Ac Charger needs to have good airflow or it will overheat. If you are having PV or battery storage installed do not accept an install like this, if your system looks like this get it inspected

Last week we installed this Viridian 18 panel in roof system for  the weather wasn’t exactly on our side but we got ther...
21/02/2022

Last week we installed this Viridian 18 panel in roof system for the weather wasn’t exactly on our side but we got there in the end just before The storm.

2x 3kw GivEnergy Ac chargers along side a Solar edge Inverter we installed for  we are always looking to improve how we ...
28/01/2022

2x 3kw GivEnergy Ac chargers along side a Solar edge Inverter we installed for we are always looking to improve how we install are systems and this ones almost perfect .

It’s been a busy few months at Ct sparks this is A recent central London installation we completed more to come on this ...
03/12/2021

It’s been a busy few months at Ct sparks this is A recent central London installation we completed more to come on this site

06/11/2021

Read our safe shoppers guide to discover the main problems when buying electrical products online and our top 10 tips when making those purchases.

Managed to Finish this one for  today Giv Energy 5kw Hybrid inverter with 2x 5.2kw Battery’s
27/10/2021

Managed to Finish this one for today Giv Energy 5kw Hybrid inverter with 2x 5.2kw Battery’s

Address

65 Caxton Court Garamonde Drive
Milton Keynes
MK88DD

Telephone

07922072802

Website

Alerts

Be the first to know and let us send you an email when CT Sparks posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category