02/10/2026
Flying up!
A big three days and we’re up to the first floor lift on this double story extension! We’ve gone for a full fill bag rubbed finish on this one to match the original house and it’s turned out great. The stepped window is a lovely feature on side and really adds to the look (a lot of cuts/splits working the blocks to brick gauge with them being imperials).
A day or two left on this once the scaffold is up and the steel at the front is in and then it’ll be all wrapped up from us. Excited to see how this one turns out!
For any advice or a free, no obligation quote, feel free to contact us.
📞 07512625340
📧 [email protected]