Another flat roof completed at the Rocker in Lossie
This one grew arms and legs once we began stripping it π
The slates were crumbling when we started to remove them, so they needed stripped off along with the sarking board. Then there was a dip in the roof that needed sorted, then the new sarking boards and breathable paper were fitted ready for prestige roofing scotland to re-slate the roof. We carried out this prep work as Craig was busy on the main hotel roof and this allowed us to get the flat roof completed.
Now for the flat roof.
The dormer roof had been extended a few times over the years. This had resulted in the roof being different heights, levels and runs.
We thought the best option was to level off the back and run new timber joists so the roof sloped to the front.
We then built up the roof with 18mm tongue & groove sterling board, a vcl, insulation and overboarded again with sterling board.
New white PVC soffit and fascia boards were fitted along with black deep flow guttering and down pipes.
Then we installed the RubberBond FleeceBack EPDM roofing system.
Thanks for looking π π