19/08/2026
Yesterday we delivered and installed a temporary gym structure for a private client in Nottingham. This is being used for a 6 week period whilst building works are carried out. Built with 40mm insulated walls, full air conditioning system and a sturdy gym floor www.webuildtemporarystructures.com