Jflemay Architecture and Design

Jflemay Architecture and Design Jflemay is a RIBA chartered architecture and design office in London, led by Jean-François C. Lemay

31/07/2026

How satisfying are these Victorian shutters? They had been screwed shut and we restored them after installing a new French door by , made of timber and double glazing.

© Jflemay Architecture and Design RIBA, 2026

19/07/2026

Walk through our Grade-II Listed flat renovation in a Victorian townhouse in South Kensington, recently completed after two years of design and construction. The main move is the creation of a new open-plan kitchen and living room, made possible by fire-rated glass partitions. The flat is acoustically insulated, the new windows are double-glazed and the historical features are restored.

Architect, lighting designer, construction administrator, videographer:
Structural engineer: and Dr Jinlong Li
Main contractor:
Bathrooms:
Kitchen:
Partitions:

© Jflemay Architecture and Design RIBA, Jean-François C. Lemay, 2026

Visualisation of a kitchen we designed for a house extension in Kensal Green, London.  We have sought with the client to...
22/06/2026

Visualisation of a kitchen we designed for a house extension in Kensal Green, London. We have sought with the client to balance traditional and modern styles. Air is extracted through the hob and sent outside via a duct in the wall. The cupboards have clear glass roofs to let sky light in and fluted glass fronts to subtly blur their contents. The rounded corners make the design humane and durable, while the brass hardware and porcelain sink bring warmth and brightness.

Design and visualisation by Jflemay Architect RIBA © 2026. Made without generative AI.

Here are 20 photos of the construction of our Grade-II listed flat project in Queen’s Gate ahead of its completion this ...
21/04/2026

Here are 20 photos of the construction of our Grade-II listed flat project in Queen’s Gate ahead of its completion this spring.

These photographs show key moments of the renovation in reverse chronological order from week 28 to the start of construction.

We’ll publish photos of the completed project soon.

1. Week 28 - Gradual completion of the living room
2. Week 28 - Completion of gilding and decoration
3. Week 27 - Gilding of cornices
4. Week 25 - Installation of the kitchen
5. Week 25 - Installation of new storage units
6. Week 21 - Installation of double-glazed timber sash windows
7. Week 20 - Laying an oak parquet on the acoustic subfloor
8. Week 16 - Plastering and repair of historic ceilings
9. Week 10 - Running of wires and pipes under a future acoustic floor
10. Week 10 - Casting of a reinforced concrete jacket around a brick pier
11. Week 8 - Wiring for a future living room chandelier
12. Week 8 - Recreation of the plant room floor
13. Week 7 - Demolition of the plant room’s floor
14. Week 5 - Raising the entrance steel beam
15. Week 4 - Pinning a brick wall in preparation for raising a steel beam
16. Week 3 - Revealing the historic ceilings
17. Week 2 - Opening the historic archway between the front and rear rooms
18. Before construction - Discovery of a historic ceiling above a false ceiling
19. Before construction - A kitchen without natural light or air extraction
20. Before construction - An archway blocked by a non-historic wall

All photographs © Jflemay Architecture and Design RIBA, 2026

Address

The Fulham Centre, 20 Fulham Broadway
London
SW61AH

Alerts

Be the first to know and let us send you an email when Jflemay Architecture and Design posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Featured

Share