15/09/2026
Ensuite Refit:
WPS transformed the ensuite by removing the existing cast-iron bath and replacing it with a new shower.
The works included:
Removal and disposal of the old cast iron bath.
Careful removal of the existing toilet and vanity unit, which were retained for re-use.
Supplying and installation of a new shower tray and shower.
Supply and tiling of the walls within the new shower area.
Supply and installation of new LVT flooring throughout the ensuite.
Reinstallation of the existing toilet and vanity unit.
The result is a complete transformation of the ensuite, creating a modern, fresh and practical shower area.
What an amazing transformation!