17/04/2026
Cold room install, behind the build.
Most people only see the finished product. Here's what goes into it before handover.
GB Controls panel schematic designed for defrost heaters, solenoid valves, fan circuits, and door heaters. Güntner evaporator wiring mapped terminal by terminal. Insulated panels sealed. Checker plate flooring laid. Then the evaporator goes from floor to ceiling brackets.
Every wire routed to spec. Every connection documented. Nothing left to guesswork.
Full design, supply, install and commissioning by BeCool.
Link in bio.