08/01/2024
A local hospital needed our help...
Wilson Group were called about a faulty submersible pump.
Once we accepted the job and our engineers were briefed, Ben and Nick attended site and removed the pump, later dismantling it in our workshop and finding it to be beyond economical repair.
Our engineers then returned to site, supplying and fitting a new pump into the pit, reconnecting the original supply cable to the new motor terminals, and re-opening local isolating valves and checking for leaks.
Unfortunately, when they completed a final test and commission for pumps loads and direction, they found that the old overload and contactors failed for the new Flygpt Pump and it was tripping.
So, they had to improvise...
Our engineers Harry & Steve later attended site, disconnecting and removing the failed star delta starter, replacing this with a brand-new product and connected original cables to the new starter. Finally, all the pumps were tested and commissioned, and were working perfectly. Well done lads!
We love helping hospitals from our excellent NHS stay afloat. Find out more about how we can help you today:
๐ https://buff.ly/48pK5ls
๐ง [email protected]
โ๏ธ 0207 228 3343