This bathroom Refurbishment was a case of out with the old in with the new.
The clients opted to have a shower only and do away with there bath as this was very rarely used.
This would give them more space in what was a congested area and layout.
The clients chose all there fixtures and fittings and wanted a wood effect theme with black being the main colour in design.
The bathroom itself had some hidden issues and once the difficult stripout was complete this become evident.
The timber walls were twisted and had very little strength and the floor was over 40mm out of level so we had to make this right before we could begin installing the new sub floor and plasterboarding the walls.
All plumbing was replaced and both the sink and toilet were relocated.