16/01/2026
New Handover: Baird House, EC1
We’ve completed another floor at 15-17 St. Cross Street, delivering a full Cat A+ refurbishment.
This project was a turnkey design and build package, including full M&E design and installation.
The finish remains consistent with our previous work in the building, ensuring a seamless standard throughout.