From bare ground to first fix.
Warehouse extension on Northfleet Industrial Estate for a Kent packaging manufacturer — 700m² of new space, steel frame, new slab, roller shutter doors, tied into the existing unit.
We’re on the M&E install now. Fit-out next, then handover.
The unit has stayed operational the entire time. No shutdown, no lost production days — which is the whole point of the way we programme industrial jobs.
Part two when it’s finished.
Follow along.
Northfleet, Kent📍