Arcane Power & Controls Midlands based Electrical Contractors covering nationwide domestic, commercial and industrial installations.
(1)

Specialising in BMS Controls.
✅ Power and Lighting ✅ Rewires ✅ EICRs
✅ EV Charging ✅ Smart Homes ✅ Home Security✅
🥇NAPIT & Trustmark Accredited

Before -> During -> After!We recently completed the installation of this Hager full RCBO+SPD Recessed fuseboard. After t...
31/08/2026

Before -> During -> After!

We recently completed the installation of this Hager full RCBO+SPD Recessed fuseboard. After talking with the client, a recessed fuseboard was selected as part of the wider renovation works. All internal components are recessed into the wall, giving a flush, sleek finish with no bulky fuseboard on show!

Get in touch today!

🌍 www.arcanepac.co.uk
✉️ [email protected]
☎️ 07949335273

Before -> AfterWe recently completed a full RCBO+SPD consumer unit (fuseboard) swap for a non compliant early 2000’s boa...
24/08/2026

Before -> After

We recently completed a full RCBO+SPD consumer unit (fuseboard) swap for a non compliant early 2000’s board.

The previous plastic board does not meet current BS7671 standards, so as part of a renovation, the decision was made to upgrade the consumer unit!

Fully tested and fully compliant with the latest BS7671 regulations.

Get in touch today!

🌍 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

Throwback to this outdoor LED Tape installation we completed a few years back!What a transformation to this garden, full...
17/08/2026

Throwback to this outdoor LED Tape installation we completed a few years back!

What a transformation to this garden, fully complete with over 20M of COB IP65 Warm white LED Tape, outdoor enclosures and transformers.

We completed this install in 2024 and we recently attended this property again to complete some additional items which are due to complete soon!

🌍 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335373

Air Conditioning unit supply completed recently!Due to the recent heatwaves we have seen a significant uplift in Air Con...
10/08/2026

Air Conditioning unit supply completed recently!

Due to the recent heatwaves we have seen a significant uplift in Air Conditioning supplies installed. We recently worked alongside Burbage Cooling & Heating to install a 20amp supply for this Midea unit at Vinyl Shakedown Records in Burbage!

This install was completed inline with the customers requirements, tested and fully compliant.

We are looking to work alongside Air Conditioning contractors across the midlands to assist with their electrical requirements.

Get in touch today!

🌎 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

The importance of servicing your EV Chargers!We recently attended a callout for a EV Charger which had suddenly stopped ...
03/08/2026

The importance of servicing your EV Chargers!

We recently attended a callout for a EV Charger which had suddenly stopped working. Power was confirmed working correctly by another contractor, however they could not locate the issue.

Upon attending site we found this overheated, loose connection which could’ve potentially led to a fire.

We isolated the charger and re-attended the following week to fit a new one. The customer is now back online and charging again!

🌏 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

HVAC Refurbishment Project Complete – Cambridge City CentreWe have successfully completed a 4-week HVAC refurbishment pr...
26/07/2026

HVAC Refurbishment Project Complete – Cambridge City Centre

We have successfully completed a 4-week HVAC refurbishment project in Cambridge City Centre, delivering containment, wiring, and commissioning works across 19 ZIEHL-ABEGG UK Ltd EC fans spanning 7 AHUs.

To eliminate any disruption to the client’s operations, all works were carried out during night shifts, from 5pm to 5am, ensuring zero downtime throughout the project duration.

This project reflects our team’s commitment to delivering technically demanding work to a high standard, while minimising impact on client operations — a key requirement for facilities in active, high-footfall environments such as city centre locations.

🌍 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

A recent kitchen rewire and fuseboard re-location/upgrade completed in Broughton Astley! We recently completed the insta...
26/07/2026

A recent kitchen rewire and fuseboard re-location/upgrade completed in Broughton Astley!

We recently completed the installation of a new socket ring circuit, Oven and Hob Supply and Spotlight installation in this newly refurbished Kitchen in Broughton Astley!

To bring the installation up to current regulations, we installed a new consumer unit with full RCBO+SPD protection. Including new gas and water earth bonding which was unfortunately ripped out prior to refurbishment.

The finish looks unbelievable! A big thanks to this client for having us involved!

Get in touch for a free quote today

🌍 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

Some recently completed outdoor socket installations!A simple but effective install of an outdoor socket can complete an...
19/07/2026

Some recently completed outdoor socket installations!

A simple but effective install of an outdoor socket can complete an outdoor space, allowing connections to things such as Lawn Mowers, Outdoor BBQs, Plug-in Hot-Tubs and much much more!

Get in touch for a free quotation today!

🌍 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

A recent small plantroom electrical installation in Oadby!Working alongside WarmFix Ltd - Heating & Plumbing, we install...
12/07/2026

A recent small plantroom electrical installation in Oadby!

Working alongside WarmFix Ltd - Heating & Plumbing, we installed a new Submain, single phase distribution board and distribution circuits to this new boiler room. Power circuits included CWS Booster Set, Gas Boiler and Pressurisation Unit.

All works completed and certified! Get in touch for a free quotation today.

🌍 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

Ohme E-Pod Installation completed ✅ We recently installed this Ohme E-Pod untethered EV Charger in Broughton Astley!The ...
01/07/2026

Ohme E-Pod Installation completed ✅

We recently installed this Ohme E-Pod untethered EV Charger in Broughton Astley!

The client specifically requested an untethered EV Charger due to space limitations. So we selected this Ohme EPod which is very reliable and budget friendly option.

All works completed in a day, including new dedicated fuseboard.

We install any brand of EV Charger! Get in touch today

🌎 www.arcanepac.co.uk
✉️ [email protected]
📞 07949335273

Address

Leicester

Alerts

Be the first to know and let us send you an email when Arcane Power & Controls posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Arcane Power & Controls:

Shortcuts

Share