ARC Building Solutions

ARC Building Solutions Complete Protection for the built environment. Established in 2008, ARC specialise in cavity fire barriers and cavity closers.

ARC Building Solutions are an independent manufacturer of solutions for the construction industry; preventing heat loss, noise pollution and the spread of fire.

Our team will be at Housing 2026 on Monday...Stop by, meet our team, and learn more about our retrofit solutions.📆 23rd ...
19/06/2026

Our team will be at Housing 2026 on Monday...

Stop by, meet our team, and learn more about our retrofit solutions.

📆 23rd - 25th June
📍 Stand F8

If you've been paying attention then you might have spotted some new faces amongst our Sales team lately 👀Introducing Gr...
17/06/2026

If you've been paying attention then you might have spotted some new faces amongst our Sales team lately 👀

Introducing Grant Softley, our Technical Sales Manager covering Scotland and the North East 🏴󠁧󠁢󠁳󠁣󠁴󠁿

Grant brings over 15 years of experience in ASM and TSM roles across the masonry sector, from brick manufacturing and cladding systems through to masonry support systems, meaning he knows the industry inside out!

In his role at ARC, Grant will be focusing on providing technical guidance and site training to developers, as well as connecting with customers across Scotland and the North East.

When we asked Grant what excites him most about joining ARC, he told us...
"I'm excited to contribute to ARC's growth plans and be part of a business that is focused on reaching new heights."

Welcome to the team ARC, Grant! ❤️

If damp and mould are on your agenda, then this one's for you.We're heading to Housing 2026 next week and our own Dr Ale...
16/06/2026

If damp and mould are on your agenda, then this one's for you.

We're heading to Housing 2026 next week and our own Dr Alex Boote and Darren Snaith will be taking to the Insight Stage to tackle one of the most pressing issues facing social housing right now.

Damp & Mould: One missed detail, whole building failure

📅 23rd June 2026
⏰ 09:30 — 10:15
📍 Insight Stage — open to all attendees

We'll see you there 👋🏻

Just one week until we're heading to Housing 2026 🏠Pop over to our stand to learn more about our innovative retrofit sol...
15/06/2026

Just one week until we're heading to Housing 2026 🏠

Pop over to our stand to learn more about our innovative retrofit solutions designed to improve the energy efficiency and liveability of homes.

📅 23–25 June
📍Stand F8

Come and meet our team! ❤️

12/06/2026

Thermal bridging creates cold spots 🥶
👇
Cold spots create condensation.
👇
And condensation creates the damp and mould that leads to health problems, complaints and costly repairs in homes.

There's one detail that gets missed on almost every retrofit project... and it's costing tenants money, comfort and health!

The eaves junction.
Where the roof meets the wall. Where loft insulation stops short, wall insulation ends and a cold gap sits in between.

The old school 'fix' of stuffing mineral wool into the eaves doesn't work either. Blocking ventilation lofts need and creating a whole new set of problems.
..But, the ARC Retrofit Wall Plate Insulator solves the problem 🙌🏻

It ensures insulation is continuous over the wall plate and into the soffit, while maintaining the 10,000mm² ventilation area required by building regulations.

Warmer surfaces, less condensation, no mould.

If you're working on retrofit programmes and this detail isn't on your radar, then it should be 👀

https://www.arcbuildingsolutions.co.uk/products/retrofit-wall-plate-insulator/

28% of UK households are affected by damp, mould, or cold.Damp and mould are huge compliance issues... but they’re also ...
10/06/2026

28% of UK households are affected by damp, mould, or cold.

Damp and mould are huge compliance issues... but they’re also health hazards.

Exposure can worsen asthma, cardiovascular conditions, and mental health. National data shows the scale of harm across the UK and why addressing these hazards is now a legal responsibility.

Our new report breaks down what this means for landlords and how to turn insight into action with compliance ready, fabric first retrofit.

Download your copy 👉 https://www.arcbuildingsolutions.co.uk/retrofit-for-warm-safe-homes/

Only two weeks to go until we'll be at Housing 2026 in Manchester 🙌🏻We’ll be showcasing our high-performance retrofit so...
08/06/2026

Only two weeks to go until we'll be at Housing 2026 in Manchester 🙌🏻

We’ll be showcasing our high-performance retrofit solutions that tackle damp and mould at critical junctions like the eaves.

📍 Find us at stand F8
📅 23 - 26 June

See you there 👋🏻

We know that protecting people, places and protecting the planet go hand in hand 🌍That's why we've set ourselves some am...
05/06/2026

We know that protecting people, places and protecting the planet go hand in hand 🌍

That's why we've set ourselves some ambitious environmental targets... and we're committed to hitting every single one of them.

We're also taking real, measurable steps towards our goal of net zero by 2050.

Take a look at what we've been working towards this year 👀

This month we’ve donated an impressive 89kg of donations to Leeds Food Bank.That’s 212 meals! 🍽️Making a big difference ...
03/06/2026

This month we’ve donated an impressive 89kg of donations to Leeds Food Bank.

That’s 212 meals! 🍽️
Making a big difference to local people in crisis.

…but, that’s not all.

In less than 2 years of supporting the food bank we’ve donated a total of a whopping 353 kg!

That’s 839 meals helping local families when they need it the most ❤️

Proof that our products really do work! 🔥A serious fire broke out on a construction site, but thanks to the correct inst...
01/06/2026

Proof that our products really do work! 🔥

A serious fire broke out on a construction site, but thanks to the correct installation of the ARC® Masonry Party Wall System, the fire was successfully contained to a single plot. It only breached into the neighbouring unit at the very last possible point of crossover.

According to the local fire brigade, the fire took over 3 hours to extinguish due to its severity, with crews battling it externally for the full duration.

This incident serves as a powerful demonstration of how ARC’s Masonry Party Wall System performs in real-world conditions.

Protecting people, protecting places, slowing fire spread, and delivering peace of mind.

Fortunately, the homes were still under construction, so no one had yet moved in. But it’s a clear reminder that fire protection starts at build stage, and it really does matter ❤️

Address

Unit J
Leeds
LS277JZ

Alerts

Be the first to know and let us send you an email when ARC Building Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ARC Building Solutions:

Share