28/08/2026
Bathroom renovation. A returning customer whose airing cupboard was left empty by us following our recent combi boiler installation wanted to utilise the new space. We removed the old bathroom and stripped the room back to basics 💪🏻 Room was then fully moisture boarded and panel boarded floor to ceiling as per the customers request, and a new cushion flooring installed. New walk in shower (where the old airing cupboard used to be), dual-flush toilet, basin vanity unit and designer radiator all fitted by us 👍🏻
Very happy customer ❤️
Pics of the before and after 🤩