30/12/2023
Now xmas is out the way I can catch up with posting some photos of recent work.
This was a bathroom completed back in October for a customer in Dartington.
A full bathroom refurb ( It took the customer about a year to fully decided exactly what they wanted ).
The refurb included a full rip out of the old suite, tiles & floor.
Pipework was adjusted to move the towel rail, basin and shower.
New walls built and a wall hung toilet fitted. The shower is now a full walk in shower with hinged flipper panel, and digital controls (with phone/app control) with hand and rainfall shower heads.
Shower panels were used in the shower area, along with tiled walls, and wood paneling above the bath.
A new heated floor fitted along with wood style click flooring.
New bath, vanity unit and mirror with bluetooth speaker & light.
An electrician fitted new light units, moved the shaver socket supply for the new mirror and a new supply for the digital shower.
Thanks to MJE Electrical Services & Cjs Plastering
www.mrplumbs.co.uk
Also on Checkatrade.com/mrplumbs - Check out my reviews!
😎😎👍👍