08/12/2024
Just a quick update on the Malvern build.
Pile Base built to receive SIPs Panel walls and covered with breathable membrane then battens to carry the Thermowood Cladding. New to this build and future builds as a design improvement - the facia cladding now matches orientation with the wall cladding. Weather permitting we will be putting on the exterior cladding and EPDM roof.
This 'Painters Studio' will also benefit from a skylight in the roof to ensure maximum light in to the space.