Sun's out, buns out. Might need to replace that 3mm Wera.
27/04/2026

Sun's out, buns out.

Might need to replace that 3mm Wera.

This week. A  Some clips. A PIR. A light shade I like. Wow.
06/03/2026

This week.

A
Some clips.
A PIR.
A light shade I like.

Wow.

A 3 day week that felt like a 10 day week 😂Anything that could have been tricky, was. Cutting out old conduits (that wer...
27/02/2026

A 3 day week that felt like a 10 day week 😂

Anything that could have been tricky, was.

Cutting out old conduits (that were also being utilised as the earth as well as the containment) & repurposing the old switch drops.

Highest R1-R2 on the old conduits was 1.21 ohms. Not bad.

The metabo got it's debut.

Penultimate pic is the best solution I had, given the time frame to guard the cables exiting / entering the conduits, given time constraints.

The last picture sums the week up






ElectricalInstallation
DomesticRewire
RewireLife.

Late night post. Controversial. 4mm² radial. Derated to a 25a 61009 as it's been wholloped in by yours truly using Ref M...
26/01/2026

Late night post. Controversial.

4mm² radial.

Derated to a 25a 61009 as it's been wholloped in by yours truly using Ref Method B.

Structural JBs - they have been banished.

Thank you please.

Phase 1 of one of the more enjoyable and interesting projects we've had for a while complete. New 16mm² 3 core SWA feedi...
01/01/2026

Phase 1 of one of the more enjoyable and interesting projects we've had for a while complete.

New 16mm² 3 core SWA feeding a new submain (db4) replacing pic 7, which was fed by a 16mm² T&E that was half in the ground and half out with no containment. New 100A/ 100mA type S RCD with OCPD fitted upstream to db4. Replacing a 100A /100mA RCD, originally there was no OCPD on the T&E.

Pump Room redone - I've popped pics of the old 3036 board that has been ripped out. That board was fed by some flex leading to a socket in the nearby garage... Noice.

Phase 2 starts in a few weeks. More tray and SWA work so shall post that too.

Board. Bonds. Beer. It's my stag do this weekend. Hopefully I'll come back?
01/01/2026

Board.
Bonds.
Beer.

It's my stag do this weekend. Hopefully I'll come back?

Cable. Posh socket. Test meter & pad.
01/01/2026

Cable.
Posh socket.
Test meter & pad.

Re-supplied a gate with an appropriate cable. It was Twin & Skin buried in a hose pipe on a 35 meter run. Tray work & so...
21/12/2025

Re-supplied a gate with an appropriate cable.
It was Twin & Skin buried in a hose pipe on a 35 meter run.
Tray work & some fabrication.
14 foot roller door to work around.
This final circuit is now decent.
Jude Bellingham is good at foot based ball.

Address

Ivybridge

Alerts

Be the first to know and let us send you an email when LV Electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to LV Electrical:

Share

Category