Jays electrical

Jays electrical All electrical services offered included small jobs to full rewires. Fully qualified. Certificated

Led in alcoves, using a PIR sensor meaning soon as you walk in the room the LED lights turn on.
15/07/2023

Led in alcoves, using a PIR sensor meaning soon as you walk in the room the LED lights turn on.

Something a bit different, led lights on the stairs for a customer in yateley
13/05/2023

Something a bit different, led lights on the stairs for a customer in yateley

Update fuse board for a property that’s going to be rented out. RCBO on every circuit and surge protection.
31/01/2023

Update fuse board for a property that’s going to be rented out. RCBO on every circuit and surge protection.

Install ceiling lights for a customer on Sheffield park
31/01/2023

Install ceiling lights for a customer on Sheffield park

Hive smart thermostat fitted for a customer in hook, hive thermostats can be controlled direct from your phone.
08/12/2022

Hive smart thermostat fitted for a customer in hook, hive thermostats can be controlled direct from your phone.

⚠ π—œπ— π—£π—’π—₯𝗧𝗔𝗑𝗧 π—¦π—”π—™π—˜π—§π—¬ π— π—˜π—¦π—¦π—”π—šπ—˜ ⚠With the clocks changing this weekend, it's a good opportunity to test the RCD function on y...
29/10/2022

⚠ π—œπ— π—£π—’π—₯𝗧𝗔𝗑𝗧 π—¦π—”π—™π—˜π—§π—¬ π— π—˜π—¦π—¦π—”π—šπ—˜ ⚠

With the clocks changing this weekend, it's a good opportunity to test the RCD function on your consumer unit (fuse board).

The Electrical Regulations recommend that this test is carried out every 6 months, yet sadly it's an important check that very few people actually do. Why not use the clocks changing as a simple reminder to test your smoke alarm, carbon monoxide detector, AND electrical consumer unit? – After all, we all have these items to ensure the safety of our loved ones, it seems crazy not to ensure they’re in full working order.

To test your RCD simply press the "T" or "Test" button to see that it trips off. When it does, most RCD brands simply push back on, although some others do need to be pushed fully down and then back up.

If your RCD doesn't trip when tested, please get in touch.

Garage conversion all finished, 2 way lighting, spot lights and under unit lights.
05/10/2022

Garage conversion all finished, 2 way lighting, spot lights and under unit lights.

First fix for garage conversion. Spotlights and sockets
13/09/2022

First fix for garage conversion. Spotlights and sockets

Something a bit different, light above dining room table. Part of a complete house renovation.
12/05/2022

Something a bit different, light above dining room table. Part of a complete house renovation.

Gorgeous garden lighting fitted and easily controlled with wireless remote. Installed with armoured cable underground an...
16/04/2022

Gorgeous garden lighting fitted and easily controlled with wireless remote. Installed with armoured cable underground and waterproof cable above ground.

Finished off a kitchen today, spot lights, under unit lights and plinth lighting. Also new feeds to fuse board for oven ...
29/03/2022

Finished off a kitchen today, spot lights, under unit lights and plinth lighting. Also new feeds to fuse board for oven and induction Hob.

New project started moving the kitchen to new location. New feeds back to fuse board, lighting, sockets and new fuse boa...
02/03/2022

New project started moving the kitchen to new location. New feeds back to fuse board, lighting, sockets and new fuse board. Update progress as we get the 1st fix done.

Address

Dovecote Way
Hook
RG248HU

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Jays electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category