13/10/2026
Important update for Part L photographic evidence
From 1st October 2026, stricter requirements will apply where photographic evidence for SAP calculations and EPC lodgements is missing or incomplete.
Previously, if photo evidence was missing, a developer’s signed declaration could be enough to lodge the EPC.
Under the new process, the building control officer must co-sign a declaration confirming they are satisfied that the construction specification was followed.
This only affects projects where evidence is missing or incomplete.
If your Part L photos are complete, sufficient, and verified by a SAP assessor, your project is unaffected.
The issue?
Taking, sorting, renaming, tagging, and emailing photos across multiple plots can quickly become a major admin burden.
That is why UK Building Compliance gives SAP clients free access to the Dashpivot app.
With Dashpivot, your site team can:
✅ Upload photos directly to our system
✅ Capture geo-tagged and timestamped images
✅ Link evidence to the right plot
✅ Get real-time assessor checks
✅ Fix issues before walls are closed or concrete is poured
Don’t risk EPC delays, extra admin, or final sign-off problems.
👉 Get a quick SAP quote today: https://www.ukbuildingcompliance.co.uk/quick-quote/
Or call 01455 634855.