30/09/2026
🏗️ Milefield Primary School Refurbishment
A major refurbishment across a live primary school requires more than technical roofing expertise — it requires careful phasing, safeguarding and coordination from day one.
📍 Barnsley | 🏫 Education | 📐 2,000m² | 👥 Barnsley Metropolitan Borough Council
Central Group were appointed to deliver a comprehensive refurbishment of the school’s ageing roof and wider building envelope while both the school and Family Hub remained fully operational.
The existing building presented several challenges, including ageing profiled metal roofing, fragile rooflights, deteriorating cladding, and structural defects in the central apex roof.
Following investigation, the works developed into a wider refurbishment programme including:
🔹 Reconstruction of the central apex roof with new structural steelwork
🔹 Installation of a Euroclad Elite 7 built-up roofing system
🔹 New Joris Ide structural decking and high-performance insulation
🔹 Replacement of fragile rooflights with Brett Martin non-fragile rooflights
🔹 Liquid-applied waterproofing to lower roof areas using Alumasc Caltech UV
🔹 Renewal of rainwater goods, flashings, fascias, soffits and perimeter details
🔹 High-level insulated cladding upgrades
🔹 Installation of a permanent Soter fall arrest system for future maintenance access
With pupils, staff and Family Hub users on site throughout, the programme was carefully phased around term dates, break periods and school holidays.
Deliveries, lifting operations and plant movements were coordinated around pupil arrival and departure times, while crash decks, scaffold protection and exclusion zones helped maintain safe separation between the works and occupied areas.
The completed refurbishment delivered a safer, more durable and thermally improved building envelope, with upgraded weather protection, improved daylighting and reduced long-term maintenance requirements.
A complex, multi-system refurbishment delivered in a live education environment with safeguarding, coordination and long-term performance at the centre of the project.
Read the full Milefield Primary School case study https://www.centralroofing.co.uk/project/milefield-primary-school/