Coxley Construction

Coxley Construction •Extensions
•Loft Conversions
•1st & 2nd Fix Carpentry
•All Aspects Of Building Work

A recent labour-only extension project completed by our team, carrying out the main structural works from the ground upS...
19/08/2026

A recent labour-only extension project completed by our team, carrying out the main structural works from the ground up
Steelwork, Masonry & Timber Flat Roof Framing

JMR Developments 🧱🏡

Reclaimed Stone ExtensionA three-storey extension constructed in reclaimed stone, carefully designed to complement the c...
21/06/2026

Reclaimed Stone Extension

A three-storey extension constructed in reclaimed stone, carefully designed to complement the character of the original property while creating over three levels of new living space.

Built into the natural slope of the site, the extension incorporates a substantial underground car port and lower-ground level, supporting two full storeys above and maximising both space and views across the surrounding countryside. Hand-selected reclaimed stone was used throughout, with traditional masonry techniques, deep stone reveals, bespoke lintels, cills and matching boundary walls this extension ties into the existing perfect.

alongside a lovely bathroom installation that is progressing.

5x Job Opportunity’s To Work Alongside The Team.
11/06/2026

5x Job Opportunity’s To Work Alongside The Team.

Harrogate Project 🏡A dream £40,000 Yorkshire Stone Patio installation delivering both structural integrity and timeless ...
10/06/2026

Harrogate Project 🏡
A dream £40,000 Yorkshire Stone Patio installation delivering both structural integrity and timeless aesthetics.

A balance of engineering and craftsmanship.

Scope of works to engineers spec
• Blockwork laid flat
• Reinforced with rebar & a393 mesh
• Concrete-filled cavity
• Faced with a tumbled walling stone
•3” weep holes carrying ground drainage aswell as ACO drainage
•Yorkshire Stone Patio Install

providing a natural finish that will continue to weather beautifully over time.

Phase 1 Carpentry Complete We’re pleased to mark the completion of the first phase on this project, delivering a full st...
05/05/2026

Phase 1 Carpentry Complete

We’re pleased to mark the completion of the first phase on this project, delivering a full structural carpentry package to a high standard.

Scope of works included:
• Trussed roof installation
• Front lean-to construction
• 400m² of floorboarding
• Full internal studwork
• Acoustic insulation to floors and walls throughout
• Kite winder staircase installation
•Flat roof works
• Plasterboarding throughout

ready for the 2nd fix👏

28/04/2026

Address

Hemsworth

Website

Alerts

Be the first to know and let us send you an email when Coxley Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share