SP Plumbing

SP Plumbing Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from SP Plumbing, Plumbing service, Hemsworth.

Water Hygiene checks on the agenda this morning and with a few tweaks this property is now ready for its new tenants
20/08/2025

Water Hygiene checks on the agenda this morning and with a few tweaks this property is now ready for its new tenants

Another bathroom completed this Bank Holiday weekend for customers in Norton. What better way to watch your favourite sh...
01/05/2023

Another bathroom completed this Bank Holiday weekend for customers in Norton. What better way to watch your favourite shows than in a hot relaxing bath.
Again all competed with our friends at OJS and Joe Vairy Electrical

10/08/2022

Another one completed today. This time for my sister. We were really tested with the space available but managed to get everything squeezed in. A complete transformation

It was a pleasure being part of this one from start to finish. Both our ourselves and our customers are over the moon wi...
05/08/2022

It was a pleasure being part of this one from start to finish. Both our ourselves and our customers are over the moon with the end result, absolutely beautiful

Another amazing transformation completed  from a tired dated bathroom, to a modern contemporary relaxation space. We par...
30/04/2022

Another amazing transformation completed from a tired dated bathroom, to a modern contemporary relaxation space. We particularly like the tv for our customers to catch up on their favourite shows after a long day.
We couldn’t have pulled this off without our friends over at OJS joinery,JV Electrical and the lads at James Hargreaves, again another top job

A bathroom conversion recently completed in Clayton West. All the old tiles, laminate and bathroom suite were removed. W...
02/10/2020

A bathroom conversion recently completed in Clayton West.
All the old tiles, laminate and bathroom suite were removed. We relocated the old soil pipe to allow more space at each side of the wc. Removing the dividing wall to the small bedroom opened up the bathroom into a truly amazing bathing space. The old bedroom door was studded out, boarded and skimmed and a new mixer shower installed in its place, together with a preformed shower base. The whole bathroom was retiled and new vinyl laminate flooring fitted. Two new towel warmers replaced the old radiators.
New spot lights were fitted in the ceiling and a Bluetooth mirror above the teak vanity unit
Plumbing and tiling completed by ourselves at SP Plumbing
Joinery and flooring by OJS and all electrics on this project by JVE

A recent completed job at a local High School, just in time for the students to start back for the new term. On this job...
31/08/2020

A recent completed job at a local High School, just in time for the students to start back for the new term.
On this job we teamed up with RCW Building Solutions
The dated art classrooms were fully ripped out and replaced with new bespoke cabinets and work surface, new paint and in one classroom new flooring.
Eight new belfast sinks were fitted in the new cabinets each complete with lever taps and individual thermostatic mixing valves to provide a fixed safe temperature

31/08/2020

We are pleased to announce that we are back fully operational again after our break due to Covid-19. We would like to thank our customers for their patience during the last few months, it’s been greatly appreciated at a difficult time.

24/03/2020

Announcement regarding Covid-19 Coronavirus:

SP Plumbing is a small family run business. Throughout this epidemic we have tried to take every precaution possible to protect ourselves and our customers from this virus.

Unfortunately the time has come following government advice
to suspend all works until the threat of this terrible infection passes. This includes emergency call out.

We do have people in the “at risk” category working with us and around us and feel this is the best option going forward. Please accept my apologies for any inconvenience to planned projects however our intention is to reschedule planned work and we will contact customers individually.

Many thanks for your continued support and understanding and we will notify you when normal business resumes

Stay safe

Kind Regards

Stu
SP Plumbing

A big project recently completed in just 9 days!! All work was completed while the customer was away on holiday. Came ba...
26/01/2020

A big project recently completed in just 9 days!! All work was completed while the customer was away on holiday. Came back to a new home.
The dated old bathroom suite was removed including the internal soil stack gaining more space after all the boxing was removed. A new modern suite was fitted including new tiles. The drain outside was cut back to allow for the new soil pipe to be installed outside. This also allowed for more wall units in the kitchen.
The kitchen window and door were both bricked up and a new opening was created in the living room for the new french doors to be installed. Radiators removed and relocated.
The wall dividing the kitchen and dining area was removed for a completely open plan space downstairs.
A new modern kitchen was fitted complete with breakfast bar and new timber flooring throughout.
An amazing space and completely different to before
Plumbing and tiling completed by SP Plumbing
Joinery, demolition and brickwork completed by our friends at OJS

Two radiators fitted today: The first, a modern flat panelled white radiator to compliment the new glass panelled stairc...
25/01/2020

Two radiators fitted today: The first, a modern flat panelled white radiator to compliment the new glass panelled staircase, which looked stunning. The second; an anthracite grey column radiator, together with exposed pipes and rustic stained floor, creating a truly charming living space.

Our latest project now complete. This was a small, cramped, dark bathroom. Not the place to relax after a hard day. Knoc...
06/10/2019

Our latest project now complete. This was a small, cramped, dark bathroom. Not the place to relax after a hard day. Knocking through to the old coal store has enabled more space for a larger shower bath (with whirlpool bath jets) and more free space in the centre of the bathroom. The old door was removed and bricked up and new upvc window installed. The towel rail and diy plumbing were removed and replaced with a large chrome towel rail. The toilet and basin were removed and replaced with a new modern vanity suite. Upvc boarding on the walls and ceiling and vinyl laminate flooring completed the new modern fresh look, looks great and easy to maintain.

Address

Hemsworth
WF94ER

Telephone

+447708385772

Website

Alerts

Be the first to know and let us send you an email when SP Plumbing posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share