Heyl Build

Heyl Build Construction company based in Hayle. Covering all aspects of construction from kitchen refits to total new builds and everything in between.

Following on from our last post. This was another ensuite we completed for the same customer. Small space. Big upgrade.T...
01/03/2026

Following on from our last post. This was another ensuite we completed for the same customer.

Small space. Big upgrade.
This bathroom proves thoughtful design makes all the difference.

This time adding a totally new ensuite into a bedroom. Maximising the space of the ensuite without taking up too much space of the bedroom.

Once again with fully tiled walls and floor.

Plumbing work again carried out by

✨ Bathroom transformation complete ✨From outdated to outstanding—this space now blends modern design with everyday comfo...
01/03/2026

✨ Bathroom transformation complete ✨
From outdated to outstanding—this space now blends modern design with everyday comfort. Clean lines, quality finishes, and attention to detail make all the difference.
Swipe to see the results 👀🛁

This bathroom was completed for a repeat customer.

All plumbing carried out by top work as always.


Another job completed this year. This was an existing raised timber decking area. Which was totally rotted away, making ...
31/08/2025

Another job completed this year.

This was an existing raised timber decking area. Which was totally rotted away, making it unsafe for the tenants to walk on.

We was asked to make a raised terrace area with storage space underneath to make use of the space. With a minimal amount of maintenance needed.

We done this by creating new concrete foundations, building a block wall perimeter, with block and beam in top to create the storage space underneath.

We finished this with paving slabs on top, timber handrails and a rendered finish on the walls.


Sorry for being quiet on quiet in here lately. We've been busy carrying out and finishing various jobs. This en-suite is...
27/08/2025

Sorry for being quiet on quiet in here lately. We've been busy carrying out and finishing various jobs.

This en-suite is one we recently finished in Connor downs.w

This involved rip out of the existing fully tiled en-suite. Re boarding using tile backer board and then fully tiled. New vinyl click flooring and the ceiling re-skimmed.

Plenty of time and effort went into the pattern on this one. With the a really high end finish.

We worked along side Leighton James plumbing and heating who carried out all first and second fix plumbing work.

If you are planning on a new en-suite or bathroom at any point get in touch.

Done and dusted. Extension, chimney removal and all re rendered for great clients bacon sandwiches and tea every day goo...
08/05/2025

Done and dusted.
Extension, chimney removal and all re rendered for great clients bacon sandwiches and tea every day good times! 😁😁😁

 A brilliant job we got to complete earlier in the year before the summer season. This job was for great customers who h...
04/01/2025



A brilliant job we got to complete earlier in the year before the summer season. This job was for great customers who have us a bit of a free reign of work. With a basic plan and principle of what they wanted they let us get to work.

This started off with 2 containers which was already cladded (completed by others) . We made everything else from scratch. We had to make in indoor seating area and sheltered area for the bar which was I keeping with the area and making the most of the amazing views.

We started by making the roof structure and then covered with a dual layer perspex roof. Then cladded the lower wall sections. Once the area was dry and sheltered we then got to work making all the furniture such as tables and seats with planters on. A raised bar/seating all the way round externally. Giving you uninterrupted views of the beach. A raised floor at the bar and a little dj booth and then finally as a last measure for winter proofing some sliding doors to really enclose the inside section during the colder days. We didn't make the sheeting windows they was done by another company.

This was a brilliant job to work on with more stuff in the pipeline so keep your eyes peeled.

If your planning any future work or need any advice or free quotations give us a message or call.

8 different composite decks completed totalling 443 m2. Frames constructed out of 6 x 2 timber and 4 x 4 posts concreted...
05/07/2024

8 different composite decks completed totalling 443 m2.

Frames constructed out of 6 x 2 timber and 4 x 4 posts concreted into the ground.
Fence posts sleeved with a composite shroud ready for a stainless steel gate to be fitted.
A set of steps leading up to to the entrance of each property.

This was carried out at bude coastal resort.


Cladco decking was used for this project.

🏡🏡 Patio homes 🏡🏡🌳 Clowance estate 🌳ExternalsPatio homes phase 1 completed.We totally refurbished these block of 4 house...
22/06/2024

🏡🏡 Patio homes 🏡🏡

🌳 Clowance estate 🌳

Externals

Patio homes phase 1 completed.
We totally refurbished these block of 4 houses from old and dated to new and modern.

All new anthracite PVC fascia and soffit all round, plus new black guttering.

Top half fully cladded with composite wood effect cladding.

New composite decking areas out the front of each property enclosed with slatted wood fencing to enclose them and make them dog friendly.

New composite decking balcony with stainless steel and glass balustrades.

Full span pergolas over the decking areas.

New hot tubs.

Pathways and parking area formed with oak sleeper boundaries and then golden flint stone covering.

Next external lighting all around.

All windows and doors replaced with anthracite double glazed PVC units.

Swipe to see before photos.

Looking forward to the next stages.

plumbing carried out by liquid solutions
Electrics by
Windows supplied by
Painting and decorating Steve Williams
Flooring by

🏡🏡 Patio homes  🏡🏡🌳 Clowance estate 🌳InternalsPatio homes phase 1 completed.We totally refurbished these block of 4 hous...
15/06/2024

🏡🏡 Patio homes 🏡🏡

🌳 Clowance estate 🌳

Internals

Patio homes phase 1 completed.
We totally refurbished these block of 4 houses from old and dated to new and modern.

Stripped back to bare structure we had all new plumbing and electrics fitted throughout. Originally being heated by electric radiators. We installed new lpg as to each property upgrading he property to gas central heating throughout.

We cladded all walls and ceilings internally with v groove cladding.

All doors replaced with oak doors.

Brand new kitchens.

Brand new main bathrooms and ensuites in each.

Luxury vinyl click flooring throughout downstairs and in bathrooms. Plus new carpets all upstairs.

New door linings, archives and skirting throughout.

All windows and doors replaced with anthracite double glazed PVC units.

Looking forward to the next stages.

plumbing carried out by liquid solutions
Electrics by
Windows supplied by
Painting and decorating Steve Williams
Flooring by

The internals of our full refurbs up clowance estate of 2 lodges. The refurbs involved. Total rip out of existing intern...
09/03/2024

The internals of our full refurbs up clowance estate of 2 lodges.

The refurbs involved. Total rip out of existing internals. Full rewire and plumbing. All walls cladded in v groove cladding. New kitchen, 2 new ensuite bathrooms, 1 main bathroom. All new second fix including doors, skirting and architrave. New laminate flooring and carpets. Fully painted throughout.

All complete ready for new guests to walk in and stay.

All electrics completed by
All plumbing by Liquid Solutions
Painting and decorating by Steve Williams.

If your looking at having any work undertaken from new doors, kitchen, bathrooms or all the way to new refurbs get In touch..

A recent project we completed at clowance estate. Full refurbishment of 2 lodges. All new external works from disabled a...
09/03/2024

A recent project we completed at clowance estate.

Full refurbishment of 2 lodges.

All new external works from disabled access ramps and composite decking all around to create access. All new composite posts with a rope hand rail.
Fully cladded in a composite cladding. New fascia soffits and guttering. All new windows and doors. Finished off with fencing and a pergola. New hot tubs installed into the decking. Finished off with external lighting.

Swipe to last pic for what it originally looked like.

All electrics carried out by
And plumbing carried out by Liquid Solutions

A great project to work on which we've now moved onto the next phase.

With spring coming up get in touch for any external works such as decking or landscaping. Getting your outside spaces ready to use this summer.

Address

Hayle
TR274

Website

Alerts

Be the first to know and let us send you an email when Heyl Build posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Heyl Build:

Share