Why pump mix matters before the truck arrives
Booking a concrete pump for your extension or driveway? The pipe setup matters more than most people think about until the day itself.
Standard line pumps carry 30 linear metres of pipeline, with more available up to 60 metres if you tell us the distance when you book. Get that wrong on the day and you're stuck waiting while we sort more pipe out.
Pump mixes need extra sand and cement compared to a standard mix, simply because the concrete has to travel through that pipework without separating or blocking it. That's a different recipe to, say, a footing mix for groundwork trenches, so it pays to tell us exactly what the pour is for.
One small thing customers often forget: we need a 20kg bag of standard cement dust on site per 20 metres of pipe, to prime the pipework before pumping starts.
Got a job coming up where you're not sure how much pipe you'll need? Tell us the distance from the road to the pour when you call, and we'll make sure the right vehicle turns up.