Project started 🚨 This week we have started a loft conversion project in Cheltenham πŸ“This large loft space will be conve...
07/10/2026

Project started 🚨

This week we have started a loft conversion project in Cheltenham πŸ“

This large loft space will be converted in to 2 bedrooms, an ensuite and a dressing room 🀩

Work well under way as the existing oak beams and ceiling have been removed to allow for new 5x3 timber joists to be sistered alongside the existing floor joists to strengthen them πŸ’ͺ🏼

8 steels to be installed with 3 down and 5 to go! Included a monster of a ridge steel spanning the length of the building 🫣

There will be a large dormer formed at the rear of the property while having a smaller dormer to the front 😎

Can’t wait to get stuck in to this one and get the structure built and watertight for our amazing customers 🏑

-

What a transformation at our Longlevens project which is now complete πŸ‘ This is more than a kitchen for this family home...
21/09/2026

What a transformation at our Longlevens project which is now complete πŸ‘

This is more than a kitchen for this family home, it has become the social hub of the house🏠

We completely redesigned the original layout to create a bright, modern open-plan kitchen, dining and living space finished to a high standard throughout 🀩

The project included:

β–ͺ️ Two sets of aluminium bifold doors with integral blinds, supplied & fitted
β–ͺ️ A completely new and improved internal layout with structural alterations
β–ͺ️ High-end kitchen with a large feature island and luxury extras
β–ͺ️ Full plumbing & electrics package
β–ͺ️ Fully decorated with Farrow & ball paint
β–ͺ️ New LVT flooring throughout
β–ͺ️ Matching fitted utility room
β–ͺ️ New downstairs WC with pocket door
β–ͺ️ Air-Conditioning unit fitted

A huge amount of work went into this project, from the initial strip-out and structural alterations through to the final finishing details,

But the end result speaks for itself. πŸ’«





πŸ“ Gloucester and surrounding areas
πŸ“© [email protected]
πŸ“ž 07753 123594



https://www.instagram.com/p/Ddj62d2kZLz/?stkn=cDY5MTZ2NGJpN216

🏑 Garage conversion well underway in Kingsway, Quedgeley!This unused garage is being transformed into an additional bedr...
11/09/2026

🏑 Garage conversion well underway in Kingsway, Quedgeley!

This unused garage is being transformed into an additional bedroom with its own en-suite, creating valuable extra space for this family home.

Floor layout plan was essential on this one to gain maximum space in both areas πŸ“

βœ… Existing downstairs W/C removed and a new entrance formed
βœ… Entrance hall and coat-storage area created
βœ… Insulated floating chipboard floor installed
βœ… Stud walls and ceiling fully insulated to Building Regulations
βœ… Plasterboarded and skimmed throughout
βœ… First-fix plumbing completed
βœ… Garage opening bricked up and new window fitted
βœ… Drainage rectified and connected for the new en-suite
βœ… Shower tray installed and tiling underway

Great progress so far β€” we’re looking forward to seeing this one completed! πŸ”¨

🚨🏠 PROJECT COMPLETE β€” QUEDGELEY, GLOUCESTER! 🏠🚨Double-storey extension shell completed and looking fantastic! A great pr...
07/09/2026

🚨🏠 PROJECT COMPLETE β€” QUEDGELEY, GLOUCESTER! 🏠🚨

Double-storey extension shell completed and looking fantastic! A great project to be involved with, delivering everything from the groundworks through to the finished shell. πŸ”¨

Works completed:

🚧 Concrete footings
πŸ•³οΈ All groundwork and drainage
πŸ—οΈ Insulated concrete floor slab
🧱 Complete brickwork shell
πŸͺš First-fix carpentry
πŸ‘Š Structural steel work throughout
🏠 Trussed main roof and warm flat roof
πŸ”¨ Fully tiled main roof
✨ Treated-timber porch, built and tiled
πŸͺ΅ Cladding to part of the single-storey section
🌿 Existing slabs renewed and small patio extended
πŸ’ͺ🏼 Complete new boundary fencing

The new driveway will finish everything off perfectly at a later date! πŸ’ͺπŸ”¨

Proud of the transformation and handed back over to our customer to carry on with the internals and they have started brilliantly 🀩

03/09/2026
Some progress shots from our kitchen renovation in Longlevens, Gloucester πŸ“-  Fresh aluminium bifolds installed with int...
19/08/2026

Some progress shots from our kitchen renovation in Longlevens, Gloucester πŸ“

- Fresh aluminium bifolds installed with integral blinds 🀩
- Kitchen & utility area all skimmed out πŸ‘ŒπŸΌ
- Entire area mist coated 🎨
- Floor self levelled βœ…
- Kitchen fitting started πŸͺš

Quartz worktops, Flooring, 2nd fix services and air conditioning install is up next ⏳ 😎

Looking forward to handing this one back over to our customers πŸ™Œ

Keep your eyes peeled for the finished piece πŸ‘€

-

Stroud extension wrapped up πŸ“πŸ§±Brickwork complete βœ…Garden wall built βœ…Extension shell finished βœ…A few tricky details tyin...
09/08/2026

Stroud extension wrapped up πŸ“πŸ§±

Brickwork complete βœ…
Garden wall built βœ…
Extension shell finished βœ…

A few tricky details tying into two previous extensions with different roof heights and pitches, but it all came together nicely in the end πŸ‘Œ

Good to get this one finished and ready for the customer to crack on with the internals πŸ”¨

Kicking on at our kitchen renovation in Longlevens, Gloucester πŸ“New opening is complete ready for the new bifold doors t...
01/08/2026

Kicking on at our kitchen renovation in Longlevens, Gloucester πŸ“

New opening is complete ready for the new bifold doors to be installed, this will transform the rear of this property and flood the room with natural light 🀩

First fix plumbing and electric are now complete βœ…

The room is now ready to be skimmed out internally ready for our kitchen install date ⏳

We can’t wait to see this one come together now 😎

-

Kitchen Remodel started in Longlevens, Gloucester πŸ“A busy start to another exciting project this week. 🀩We’ve stripped t...
24/07/2026

Kitchen Remodel started in Longlevens, Gloucester πŸ“

A busy start to another exciting project this week. 🀩

We’ve stripped the space right back to a blank canvas by removing the old kitchen, internal stud walls and lifting the glued-down LVT flooring, ready for the work to begin. 🏠

First fix carpentry is now complete, creating a brand new layout featuring a large open-plan kitchen, a modern downstairs W/C and a separate utility room πŸͺš

Plumbing and electrical first fix have also started. 🚰 ⚑️

Next up... opening up the rear of the property with a large bi-fold opening before the new kitchen really starts to take shape. 🏠

Keep following for the full transformation. πŸ”¨

Nearly ready for the roof trusses at our double storey extension in Quedgeley πŸ“Scaffold lift raised today ready for the ...
16/06/2026

Nearly ready for the roof trusses at our double storey extension in Quedgeley πŸ“

Scaffold lift raised today ready for the wall plates, roof and gable brickwork next πŸ“ˆ

Some nice progress being made on this one in the first 3 weeks πŸ’ͺ🏼

Being watertight is not too far away ⏳

Look forward to seeing the end result πŸ‘·πŸΌβ€β™‚οΈ

-

Address

Gloucester

Alerts

Be the first to know and let us send you an email when J M Hamlin Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to J M Hamlin Construction:

Shortcuts

Share