11/10/2026
After our 8:30pm finish last night crossing the Bearsden rewire, The LBD team set off at 7:30am this morning for Largs to start a double flat rewire near the coast here.
Interestingly these 2 flats side by side 1 being a 1 bed flat and 2 being a 3 bed flat. We’re being used illegally as Cannabis Farms. So there is a lot of unsafe rigged electrics. Which is our starting point today.
I came down last week and isolated the entire building. Today’s job is tracing the mains stripping out making all safe. Then setting up a temporary supply board for work to commence safely as of tomorrow for all trades.
Another large project ahead for the LBD Electrical team 💪🏼