11/02/2026
We have an early morning lift supply going in at Andrea restaurant, Adams Court in the city of London.
We have an ongoing programme of works at this site. They are changing over their lifts for the next 12 -18 months. This is Lift number 2 down of 11 on this site.
Mennekes 3PN&E Lockable Switch Socket Outlet.
D-Line Clip with the Low smoke SWA. Works a treat. Fire rated and a fast system to install.
Prysmian LSZH XLPE Armoured 6mm 5 core. Always the best cable to work with.
Test equipment- Trusty, reliable Megger MFT1721.
Had a few testers of the years. Can’t go wrong with these 👍🏻
This supply was a short run. So we did a little preparation prior to shutting down and locking off before works. This was to limit the time the lift was out of an action for the staff.
Keeping them happy is important. You get the little perks of nice coffee👌
We’re be back soon 🫡
cityoflondon🇬🇧