Connor Construction-South West-Ltd

Connor Construction-South West-Ltd PLANING IT UP & LAYING IT DOWN! SINCE 2008 Our great reputation has taken us across the globe, including the UK, Cyprus, Ireland and the Falkland Islands.

Connor Construction (South West) Ltd provide the most comprehensive list of services available to the Highways and Road Construction industry. We supply our industry with a world-class fleet of surfacing and planing machinery, as well as the expertise and man-power to match. So, where will you take us next? Speak to us today about how we can help you.

Our Mid Wales Depot Covers all your surfacing & Civil Engineering  requirements from▪️ Planer Hire ▪️ Paver Hire ▪️ Spra...
04/07/2022

Our Mid Wales Depot Covers all your surfacing & Civil Engineering requirements from

▪️ Planer Hire
▪️ Paver Hire
▪️ Spray Tanker Hire
▪️ Labour Hire

Hand lay and Machine Gangs available

No job too Big or too small

Speak to our Contracts Manager Dean Evans for any of your surfacing enquiries.

☎️ 01373836182
☎️ 07519125687
📧 [email protected]

Check out our new Dynapac Tracked SD2500 CS, laying type 1 to ensure a perfect level ready for plate testing. 🚧The secon...
25/05/2022

Check out our new Dynapac Tracked SD2500 CS, laying type 1 to ensure a perfect level ready for plate testing. 🚧

The second day involved laying base and binder to the roads for a valued client. The versatility of this paver not only achieved perfect levels, but also reduced time in stone laying against a conventional 360 digger.

Do we have any other Dynapac fans out there?



6mm “Buff” asphalt surface course supplied by Bituchem and laid in pedestrian areas at Blaise Castle Estate; we don’t ju...
24/05/2022

6mm “Buff” asphalt surface course supplied by Bituchem and laid in pedestrian areas at Blaise Castle Estate; we don’t just deal with black asphalt at Connor Construction! 🚧😎

What have you been laying this week?


Here is what our clients have had to say about us!Get in touch with us today and find out how we can help you too 👷‍♀️👷‍...
18/05/2022

Here is what our clients have had to say about us!

Get in touch with us today and find out how we can help you too 👷‍♀️👷‍♂️


04/05/2022

40T planed with our W35DC in just 4 hours! 😎

Our expert planing teams did an excellent job for a valued client at Bournmouth Gardens.

We used the W35 as there was weight limit on the footpath. Perfect machine for the job!

Well done all!


First day on the job for a valued client at Exeter! We are exposing the Type One and leaving it in the cut. This is so t...
03/05/2022

First day on the job for a valued client at Exeter!

We are exposing the Type One and leaving it in the cut.

This is so that our client can still have access and egress throughout the site, until they’re ready to excavate and fit a new water system.

Who else has been Planing It Up this week?


Check out our 2018 Sweeper with a fresh set of graphics! 🎨Currently, we have 2 Sweepers for hire. But, due to our excell...
28/04/2022

Check out our 2018 Sweeper with a fresh set of graphics! 🎨

Currently, we have 2 Sweepers for hire. But, due to our excellent 24 hour service, they are in constant demand, which is why we have a new one on order! 🙌

We will be receiving a new Scania P320, with trailer coupling so that it can tow our Wirtgen W35 planer.

Who else operates Sweepers? What make/model do you use?


Special delivery! 😎
27/04/2022

Special delivery! 😎

Another job well done! 👷‍♀️👷‍♂️                     #
26/04/2022

Another job well done! 👷‍♀️👷‍♂️


#

Safely arriving to site! What are you working on today?
25/04/2022

Safely arriving to site!

What are you working on today?


Laying the hot stuff!          '
22/04/2022

Laying the hot stuff!


'

Some more great work from our staff, this time on a new permeable car park! 👷‍♀️👷‍♂️  We used 300t of 20mm Hanson Tuffdr...
21/04/2022

Some more great work from our staff, this time on a new permeable car park! 👷‍♀️👷‍♂️

We used 300t of 20mm Hanson Tuffdrain and 150t of 10mm Tuffdrain which was laid over a Type 3 low fines sub-base installed by our customer prior to our surfacing visit.

It was laid in March, over the course of 2 days, for a very valued client.

What have you been working on this week?


Address

The Workshop, Crees Quarry
Frome
BA114PX

Alerts

Be the first to know and let us send you an email when Connor Construction-South West-Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Connor Construction-South West-Ltd:

Share

Category