26/11/2025
Perfect example of why commissioning a system properly, matters. Daikin VRV4 installed about 6 years ago has had a blocked liquid line from an over braze this whole time, even held 25 bar with an open end. This would’ve failed a test run multiple times and should’ve been spotted on day 1 of operation.