Existing bathroom removed, electrics all rewired, pipe work refreshed, new wall created in hall to encompass ensuite as ...
21/09/2025

Existing bathroom removed, electrics all rewired, pipe work refreshed, new wall created in hall to encompass ensuite as part of bedroom, walls and ceiling skimmed.

Bathroom walls, bath panel and floor tiled.

New massorator toilet installed, bath installed with new bath tap and shower mixer, new basin with vanity unit and towel rail.

Two new oak veneer doors installed.

Fantastically modern bathroom.

Existing bathroom and toilet removed, including wall between both rooms. Existing door to toilet blocked up. All plumbin...
07/08/2025

Existing bathroom and toilet removed, including wall between both rooms. Existing door to toilet blocked up.

All plumbing and wastes refreshed and relocated for new free standing bath.

All electrics re wired to merge rooms and installed new downlights and switching.

Ceiling plastered

Walls and floor tiled to include feature walls in shower area.

New large shower tray installed, with thermostatic mixer valve and fixed panel enclosure.
New free standing bath installed with pillar taps. New basin with vanity unit, a closed coupled toilet and new ladder towel rail installed.

Lovely large bathroom transformation to maximise space and usability, unfortunately forgot to take the before pics on this one and the next one, oops

Happy happy client

Existing en-suite removed, refreshed wastes and plumbing. Electrics re wired Ceiling plastered, walls and floor tiled. N...
30/06/2025

Existing en-suite removed, refreshed wastes and plumbing. Electrics re wired

Ceiling plastered, walls and floor tiled.

New shower tray and enclosure installed, new thermostatic mixer installed, new concealed system toilet and basin with vanity unit installed, new mirror and towel rail installed.

Great refresh to an en-suite

Existing bathroom removed and all plumbing and wastes refreshed. Chrome pipe tails installed for new towel rail. Light s...
09/03/2025

Existing bathroom removed and all plumbing and wastes refreshed.

Chrome pipe tails installed for new towel rail.

Light switch installed on hall wall outside bathroom.

All walls and floor fully tiled.

Installed bath, bath panel, bath screen, new thermostatic bar shower mixer valve, basin with vanity unit, closed coupled toilet, mirror and ladder towel rail.

New bifding door also installed to create space.

Great update to a family bathroom.

Existing kitchen, dining room and rear single storey room turned into an open plan kitchen diner. Existing kitchen remov...
30/12/2024

Existing kitchen, dining room and rear single storey room turned into an open plan kitchen diner.

Existing kitchen removed, walls removed between kitchen and existing dinning room and existing rear room.

2 x RSJ’s installed to brace existing external cavity wall.

All electrics renewed for new location of kitchen

Cavity stud wall installed to rear room wall including PIR ridged insulation and to ceiling.
Rockwall Insulation installed to new kitchen ceiling

Section of floor latexed

All walls and ceiling plaster skimmed

New engineered flooring laid and skirting

Radiators relocated

New kitchen fitted with quartz worktops

Massive space creation and usable space.

Existing roof suffered damage from a local isolated tornado in Aldershot. Existing roof including tile batten stripped o...
22/12/2024

Existing roof suffered damage from a local isolated tornado in Aldershot.

Existing roof including tile batten stripped off.

Felt and battened with breathable felt and treated batten.

New Redland 49 tiles installed.

Dry ridge kit installed with hip irons.

Great refresh of an existing roof all ready for winter!!

Existing gas fireplace converted into a log burner. Gas fire removed and gas supply capped. New double socket and HDMI s...
15/11/2024

Existing gas fireplace converted into a log burner.

Gas fire removed and gas supply capped.

New double socket and HDMI socket installed on chimney breast.

Existing surround removed and opening made bigger. Concrete pre stress lintle installed.

Herringbone effect fire boards installed.

Plaster skimmed chimney breast.

40mm thick slate hearth installed

4.9kw log burner installed with flu kit, chimney cowl, register plate and CO2 alarm.

Great upgrade ready for Christmas.

Existing en-suite removed including flooring and tiles. All pipe work refreshed and wastes relocated for shower tray to ...
28/10/2024

Existing en-suite removed including flooring and tiles.

All pipe work refreshed and wastes relocated for shower tray to sit on bathroom floor.

Bathroom floor and walls completely retiled

New free standing bath with anthracite pillar taps, basin with vanity unit, anthracite shower enclosure with bar thermostatic shower mixer valve, closed coupled toilet, anthracite towel rail and electric mirror with heat pad all installed.

Client painted themselves.

Great upgrade to a beautiful en-suite

Existing en-suite and main bathroom converted into one en-suite bathroom. Wall removed between bathrooms and both existi...
21/10/2024

Existing en-suite and main bathroom converted into one en-suite bathroom.

Wall removed between bathrooms and both existing bathroom suites removed

Existing electrics decommissioned, new downlights and extractor installed and feed for mirror.

All plumbing refreshed and relocated. New waste pipes run through floor and into stack.

Full tiled floor to ceiling and vinyl flooring laid.

Closed coupled toilet, basin with vanity unit, electric mirror with heat element, ladder towel rail and shower enclosure with thermostatic bar showering system all installed. All supplied by DW Burns Showroom

Ceiling plastered and painted

Great bigger en-suite created with lovely big shower.

Existing bedroom converted into main bathroom. Cupboard removed, and existing electrics decommissioned, new downlights a...
01/10/2024

Existing bedroom converted into main bathroom.

Cupboard removed, and existing electrics decommissioned, new downlights and extractor installed, feed for mirror and switch relocated to outside in hallway.

All new hot and cold feeds run for bath, toilet, basin and shower. New waste pipes run through floor and through to stack in downstairs cloakroom.

Full tiled floor to ceiling and vinyl flooring laid.

Bath, closed coupled toilet, basin with vanity unit, electric mirror with heat element, ladder towel rail and shower enclosure with thermostatic bar showering system all installed. All supplied by DW Burns Showroom

Ceiling plastered and painted and window cassette change to satin opaque glass.

Great transformation of a bedroom into bathroom.
❤️❤️

Existing fireplace and hearth removed and opening made larger, scratch coat applied and re plastered and rendered, leavi...
12/09/2024

Existing fireplace and hearth removed and opening made larger, scratch coat applied and re plastered and rendered, leaving a nice smooth finish, new hearth to be installed once delivered.

Existing drainage excavated and decommissioned, new drainage channel dug and  new plastic drainage pipes laid, new inspe...
04/09/2024

Existing drainage excavated and decommissioned, new drainage channel dug and new plastic drainage pipes laid, new inspection chamber installed, all laid in 10mm pea shingle, commissioned and trench backfilled.

Better and more effective drainage system

Address

34 Weybourne Road
Farnham
GU99HG

Alerts

Be the first to know and let us send you an email when JSL Building Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JSL Building Services:

Share

Category