Corletts Carpentry

Corletts Carpentry Carpentry and small building works

Window seat replaced on this cottage using a nice oak slab sanded up for the seat. Now ready for plastering.
14/09/2022

Window seat replaced on this cottage using a nice oak slab sanded up for the seat. Now ready for plastering.

Larch fencing and matching gate made up on this curved garden wall.
14/09/2022

Larch fencing and matching gate made up on this curved garden wall.

Back of the house framed out ready for decking now the scaffolds down. Cladding almost finished just the post left to do...
15/06/2022

Back of the house framed out ready for decking now the scaffolds down. Cladding almost finished just the post left to do.

Oak post and beam porch clad in cedar 🔨
29/04/2022

Oak post and beam porch clad in cedar 🔨

Some cedral cladding and second fix works recently completed 🔨
13/04/2022

Some cedral cladding and second fix works recently completed 🔨

Cedar cladding finished along with gutters and down pipes ready for the scaffold to be dropped.
08/03/2022

Cedar cladding finished along with gutters and down pipes ready for the scaffold to be dropped.

Roof complete ready for slating 🔨
11/02/2022

Roof complete ready for slating 🔨

Steels are in ready for rafters on this loft conversion
23/01/2022

Steels are in ready for rafters on this loft conversion

Some jobs from the last week 🔨
19/12/2021

Some jobs from the last week 🔨

Small shoe rack with a mahogany top and some second fix works in Exeter.
30/11/2021

Small shoe rack with a mahogany top and some second fix works in Exeter.

Last of the roof finished off, tails cut back, sub fascia and soffit fitted. Inside the flooring, studwork and door lini...
05/11/2021

Last of the roof finished off, tails cut back, sub fascia and soffit fitted. Inside the flooring, studwork and door linings are in ready for electrics, boarding, skimming e.c.t

Roof completed as far as possible, waiting to hear back from planning before for the final section can be finished. Insi...
22/10/2021

Roof completed as far as possible, waiting to hear back from planning before for the final section can be finished. Inside now ready flooring, last few stud walls and door linings pictures to follow.

Address

Exmouth

Telephone

+447759420743

Website

Alerts

Be the first to know and let us send you an email when Corletts Carpentry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category