Fuzed Group Providing 1st Class Electrical & Mechanical Services throughout the whole of the south west ��

A special delivery for this project for personal reasons - team worked miracles on such a tight deadline. 💚⚡️☀️
31/07/2025

A special delivery for this project for personal reasons - team worked miracles on such a tight deadline. 💚⚡️☀️

* 𝙋𝙧𝙤𝙟𝙚𝙘𝙩 𝙐𝙥𝙙𝙖𝙩𝙚 - 𝙉𝘿𝙃 𝘿𝙚𝙫𝙤𝙣- 𝟭𝟬𝟮𝙠𝙒 𝘾𝙖𝙧𝙥𝙤𝙧𝙩 * Fuzed Group has successfully delivered the i͟n͟s͟t͟a͟l͟l͟a͟t͟i͟o͟n͟ aspect of the commercial solar carport project in Barnstaple - North Devon,...

Another fantastic delivery ⚡️
17/07/2025

Another fantastic delivery ⚡️

Project Completion - *Selsey 2mW Rooftop* Fuzed Group has successfully delivered significant commercial solar projects in Selsey consisting of 2mW of PV over two MPANs on the same site, on behalf of our EPC client, Eden Sustainable Ltd. This project, featuring a SolarEdge Technologies system with a....

Labourers will require working nationwide five days a week starting from £130 per day up to £200 for lead roofers!CSCS r...
17/07/2025

Labourers will require working nationwide five days a week starting from £130 per day up to £200 for lead roofers!

CSCS required, Travel, Accommodation, Work uniform & Tools provided.

Working on large scale Soalr PV projects throughout the UK with immediate start⚡️ ☀️

Please contact us directly or email:

[email protected]

23/12/2024

As 2024 comes to a close, Fuzed Group celebrates a successful year marked by significant achievements, including a notable solar project in collaboration with Manchester City Football Club & Solar Co. This project, executed by Fuzed Group’s in-house engineers, showcases their commitment to delivering high-quality installations regardless of project size. Here we have some arial footage of the Joie stadium in action.

The project involves the installation of over 10,500 solar panels, aimed at supporting the club’s sustainability goals and transitioning to self-supplied renewable energy. This initiative is part of Manchester City’s broader strategy to achieve net-zero carbon emissions by 2030.

The solar panel installation is divided into two phases. The first phase focuses on rooftop installations, expected to be completed by the end of 2024, while the second phase which will be delivered by the Fuzed Group will add ground-mounted panels throughout the facility, targeting completion before the end of the 2024/25 season

On a personal note the Fuzed Group has experienced a record year, adhering to their philosophy of delivering the highest quality of installations possible. This commitment has led to several clients securing large tenders, reflecting the company’s reputation for quality work. Client feedback has underscored the value of Fuzed Group’s contributions to these prestigious projects, reinforcing the adage that “good work sells itself.”

Fuzed Group & myself extends heartfelt thanks to all clients for their trust and collaboration on significant projects throughout the UK. Looking ahead to 2025 and beyond, the company is eager to strengthen existing relationships and foster new ones, continuing to provide exceptional service and support in the renewable energy sector.

In the spirit of the season, Fuzed Group wishes everyone a Merry Christmas and a prosperous New Year, looking forward to more successful projects and partnerships in the future. ☀️⚡️🎄 SolarEdge Technologies Inc.

Project Update ☀️⚡️
16/11/2024

Project Update ☀️⚡️

*Project Update - Selsey 2mW Rooftop* The Fuzed Group is making significant strides in their 2mW SolarEdge Technologies installation project at Selsey, having…

⚡️☀️⚽️
08/11/2024

⚡️☀️⚽️

📏☀️⚡️
03/04/2024

📏☀️⚡️

12/01/2024

Fuzed Group are on the look out for an two Apprentice to work along side our ever growing team of engineers to help install commercial Solar PV systems to clients all across the UK from 100kW up to multi-megawatt projects nationwide.

In this role you will be taught everything AC related from Commercial & Industrial AC to Solar PV installations.

They would be happy to frequently stay away and travel nationwide. Ideal candidate will do 1 week at collage and 3 weeks on site Monday - Friday.

We're offering double the National minimum apprentice wage with progression every year until completion.

The Role:
-Electrical NVQ Level 3
- Installing commercial PV systems from 100kw up to multi megawatt
- Nationwide travel
- Excellent learning potential with future progression within the Fuzed Group

The Person:
- Enthusiastic
- Willing to learn
- Able to enrolee on an NVQ level 3 program with college
- Punctual

Please contact us for further particulars:

[email protected]

12/01/2024

☀️⚡️

02/01/2024

Fuzed Group have secured a healthy pipeline of projects for 2024/ 2025 Nationwide we’re looking for the following trades to join our ever expanding team:

Self employed Electricans. You must hold a valid ECS Gold card with the latest wiring regulations, Inspection and testing, have a proven track record of delivering commercial installations.
Day rate £230+ (price negotiable)

Labourers the candidate must hold CSCS cards / IPAF/ Telehandler licences would be advantageous - Training can be provided.
Day rate £130

2 x experienced roofers with a proven track record of delivering large commercial PV rooftop installations, Ground mount experience would be beneficial however not essential. CSCS card, IPAF, Telehandler licences , SSTS would be advantageous, training can be provided.
Day rate £150+ (price negotiable)

We are looking for candidates Nationwide, we can supply work van to the right personal.

All the above positions require working away Monday-Friday, All accommodation is pre-booked with Air B&B, wages paid weekly.
If you are interested in the above roles please email [email protected] .

No agencies please, feel free to share.

Thanks,
Kieran.

Full turnkey Commercial project delivered Electrically & Mechanically on behalf of Perfect Sense Energy671.17kWp System,...
20/08/2023

Full turnkey Commercial project delivered Electrically & Mechanically on behalf of Perfect Sense Energy

671.17kWp System, works carried out during a busy period for the site.

System specification:

• x6 100K-5G 5G 100KW 3 phase inverter’s

• x1 Solis Export Power Manager unit paired with Rogowski 2500a 36’’ CTs & Accuenergy Three Channel Rogowski Coil - Integrator. Supplied by Camax UK Ltd

• x1637 Risen Energy Co., Ltd. 410w RSM40 Monocrystalline PV Modules

• S:FLEX GmbH rail mounting system

• PVDB supplied in house by us and built by the fantastic Simon Holdcroft from DSH cables and controls - highly recommend for any project
within the PVDB.

• Containment rooftop - Legrand Hot Dipped Galvanised to ensure longevity for years to come whilst installing A2 stainless fixing screws + EPM to avoid electrolysis.
Legrand cable ladder - All Supplied by Superlec

• Cable - All LSF H07/SWA Supplied by Eland Cables

• Cembre Group Lugs paired with CMP LSF Glands - supplied by the fantastic ETS Cable Components.

•Location: Yeovil - Somerset

Electrical -Space was tight with no room to wall mount inverters meaning a uni-strut frame was erected. Electrical design carried out in house by Fuzed Electrical, this was particularly challenging as the client requested we used the available x2 630a supplies. However we over come this with a custom built PVDB which contained everything for the system to work seamlessly whilst looking fantastic!

Mechanical - Installation was very challenging with the weather choosing to rain most days - freshly painted roof mixed with 100mm crown to crown centre’s made things very challenging. The mounting system requiring us to install the supplied EPDM tape which wasn’t possiable in the wet. However we still remained professional & installed to the highest of standards despite these set backs taking longer then planed.

On to the next project ⚡️☀️

29/07/2023

550kW in 2 weeks ⚡️👊🏼