10/10/2026
Ashford hockey club Plant room installation complete. This plant room originally had 2 x old Andrews water heaters for the buildings Hot water and a large floor standing cast iron boiler for the heating.
We re designed the set up and installed 2 x unvented HW cylinders heated by a small Vaillant heat only boiler. We replaced the heating boiler with a cascade system consisting of 2 x Vaillant 64 kw commercial boilers and a plate to plate heat exchanger to separate the old systems pipework to the new setup.
All fully tested and insulated ready to heat the building for next 20+ years. Thankyou to for modified the controls for us.