27/08/2026
⭐️⭐️⭐️⭐️⭐️What a start to this project! 🔨🏠
The existing conversion has now been fully stripped out, taking everything right back ready for the new structure to begin.
So far this week we have:
🔨 Fully stripped out the existing conversion
🧱 Taken down the brick wall to create the opening for the future staircase
🏗️ Measured and ordered all necessary steelwork ready for fitting tomorrow
🪜 Erected all necessary scaffolding for both dormers
🚛 Skip onsite and keeping everything organised
🪵 All structural timbers delivered
🔩 Around half of the existing joists already doubled up ready for the new floor structure
As you can see from the photos, health and safety is also something we take extremely seriously.
We now have a dedicated Health & Safety Officer working alongside us to make sure we are complying with all necessary procedures throughout our projects and, most importantly, doing everything possible to make sure every tradesman goes home safely to their family at the end of each day. 👷♂️❤️
Tomorrow’s aim is to get the steel beams installed and continue pushing on with the structural works throughout Saturday.
The team are working this Saturday to make sure we are fully prepared going into next week, when the exciting part really begins, opening up the roof and starting construction of the new rear dormer. 🏠🔨
A brilliant effort from everyone so far.
One team, all pulling in the same direction and striving for the same thing. ❤️