27/05/2026
Great weather for a great day of work ☀️
The team here at AKD recently completed the electrical upgrade of the café and toilets at the historically listed 18th-century Chatelherault Hunting Lodge in Hamilton for Maxi Construction Ltd.
Works carried out included: partial strip out, new containment, new distribution board, general lighting, lighting controls, emergency lighting, small power, heating, and fire alarms.
As this is a listed building, and required to remain open for the duration of the works, careful planning was required to ensure disruption was kept to an absolute minimum, with much of the work being completed outside of standard working hours. Another first-class electrical installation carried out by AKD Systems Ltd.