O’Kane Formwork & Construction

O’Kane Formwork & Construction Formwork & Concrete Specialists.

Retaining walls | Tanks | Agricultural Builds | Concrete | Commercial & Civil Projects
Across UK and Ireland.
10+ years experience reliable work & returning clients

05/07/2026

Engineer-certified slurry tank now underway in County Tyrone. Excavation completed and stoned💪

Looking for a reliable contractor for your next agricultural concrete project?O’Kane Formwork & Construction specialise ...
02/06/2026

Looking for a reliable contractor for your next agricultural concrete project?

O’Kane Formwork & Construction specialise in:

✓ Slurry & Dairy Tanks
✓ Retaining Walls
✓ Silage & Manure Storage
✓ Agricultural Buildings
✓ Civil Concrete Projects

Based in NI

Free quotations available.

📞 07548 774325


3.3m reinforced concrete wall completed for a future lean-to cattle shed extension, tying into an existing agricultural ...
13/05/2026

3.3m reinforced concrete wall completed for a future lean-to cattle shed extension, tying into an existing agricultural building.

Clean fair-faced finish carried throughout with all formwork, steel fixing and concrete works completed by ourselves.

Built to provide a strong retaining and structural wall ready for future steelwork and roof installation.

📍 Co. Tyrone
📩 Message the page for enquiries or quotations.

Reinforced retaining wall constructed alongside cattle shed to maximise usable yard space.Wall stepped from 2.1m down to...
11/05/2026

Reinforced retaining wall constructed alongside cattle shed to maximise usable yard space.

Wall stepped from 2.1m down to 3.6m to suit existing ground levels, incorporating a 160° change in direction through the run.

6-inch drainage pipes installed at intervals throughout the wall to relieve water pressure and prevent buildup behind the structure.

All formwork, steel fixing and concrete carried out in-house, with a clean fair-faced finish throughout.

Repeat client, project completed in Co.Tyrone

📩 Contact for enquiries

6-bay cattle shed extension completed, tying into an existing building.Concrete walls constructed with multiple door ope...
08/05/2026

6-bay cattle shed extension completed, tying into an existing building.

Concrete walls constructed with multiple door openings to allow separation between livestock pens while maintaining safe movement throughout the shed.

All door reveals were chamfered internally to help prevent livestock injury moving in and out, with the external faces left recessed to allow future door frames to sit flush within the wall.

Clean finish throughout with all formwork, steel fixing and concrete works carried out in-house.

Agricultural slurry tank completed for a dairy farm3-pier wide tank with internal wall constructed to suit a semi-automa...
05/05/2026

Agricultural slurry tank completed for a dairy farm

3-pier wide tank with internal wall constructed to suit a semi-automated milking system

All formwork, steel fixing and concrete carried out in-house

Warehouse and loading bay walls completed at Nutts Corner.Concrete formwork and wall construction carried out as part of...
04/05/2026

Warehouse and loading bay walls completed at Nutts Corner.
Concrete formwork and wall construction carried out as part of a warehouse development project for Sysco.

Address

Glenullin, Garvagh
Derry
BT51

Opening Hours

Monday 6am - 8pm
Tuesday 6am - 8pm
Wednesday 6am - 8pm
Thursday 6am - 8pm
Friday 6am - 8pm
Saturday 6am - 8pm

Website

Alerts

Be the first to know and let us send you an email when O’Kane Formwork & Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share