02/10/2025
Replacement watermain installed from stopvalve at road to rear of property with help from Paul and Nathan Oneill Dornan Contracts. Trench dug, 100 metres of 32mm supply pipework installed including duct ( for protection and replacement if ever necessary ), trench backfilled and top-soiled to re-instate garden. Greatly improved flow from taps and showers 👍