07/06/2026
A full rip out isnβt always required to transform a bathroom.
With this job we -
Removed the tiles and plasterboard on three walls
Altered the pipe work to the shower so it was concealed.
Fitted a new bath, shower and basin vanity unit.
We left in the the floor tiles, left the ceiling, one tiled wall and the toilet.
A 4 day turnaround and amazing results ππ