12/09/2026
Most recent work carried out for a new client in knutton ( newcastle )
Entrance, stairs, landing and bathroom refresh.
Also added new architraves throughout and skirting boards in bathroo.
Walls weren't great. I originally thought it was because someone painted over peeled paint and all dried solid. After I started prep I realised this wasnt correct. It at some point had woodchip paper on the walls, someone removed most and painted over left over backing paper. Didn't look great, but client thought about getting it plastered which really wasnt necessary and quite frankly a cost not worthy of being needed.
A good sand, some filling and a little TLC got the walls to be smooth and some woodwork tidied up the best it can be without creating more harm than good.
Colour is summer linen by dulux ( cream colour with beige undertones ) colour matched into cleanable matt.
Woodwork done in aqua guard.
Door weren't going to get done as they are getting new, but I gave them 2 coats anyway so its fresh until they do get their fresh new doors.