Works included:
1) Removal of old kitchen
2) Fitting new electrical sockets
3) Re-siting fused spur for washing machine
4) Installing new fused spur for extractor fan
5) Removing old coving
6) Removing old skirting boards
7) Removing old tiles
8)Removing kitchen wallpaper
9) Re-plastered all walls and ceiling (by other trusted contractor)
10) Installed new kitchen units, cornice & under cupboard lights.
11) Installed new doors, including a lovely new sliding “Barn door”.
12) Installed new quartz worktops & sink (by other trusted contractor)
13) Tiled new window sill.
14) Installed new gas hob (by other trusted contractor)
15) Installed new flooring
16) Installed new lights
17) Installed new skirting boards
18) Plumbed in new sink & tap, including lowering the waste water connection.
19) Installed new oven.
20) Installed new extraction unit over hob.
21) Installed new coving.
22) Painted throughout.