23/07/2026
Last big job I completed for lovely customers, I have not posted all pics as there were hundreds!:P
- lots of boxing in pipes
- lots of mirrors etc hung on walls
- lots of radiator covers built and installed to wall
- loads of flatpack to be assembled, inside and outside
- dig up old pathway and lay down stone
- fair amount of painting done
- latch all gates
- repair gate posts
- mount hose pipes to walls
- trellis fitted on top of the wall
- blinds + curtain poles put up
- faux panelling made and painted
And much more :)