Ellis Developments Cumbria based📍Covering a wide range of construction 🏠
📲 - 07875574196
📧 - [email protected]

👏👏
02/10/2026

👏👏

💥 X2 6M STEELS, INSTALLED & READY! 💥Our 6m structural steels are now in place on this single-storey rear extension, all ...
28/09/2026

💥 X2 6M STEELS, INSTALLED & READY! 💥

Our 6m structural steels are now in place on this single-storey rear extension, all bolted & fabricated on site. Opening up the space and creating a solid foundation for the next stage of the build.

Structural work done right ✅ 🏗️

Give us a call for any enquires 📲

Another one taking shape 🏠Single-storey lean-to extension finished off today, with the peaks formed and all the roof tim...
09/09/2026

Another one taking shape 🏠

Single-storey lean-to extension finished off today, with the peaks formed and all the roof timber work now in place ⭐

Thanks to B.T Joinery for the quality timber works once again 🤝

Brickwork • Extensions • Groundworks • All Aspects of Construction - 📍 Cumbria

OUT WITH THE OLD, IN WITH THE NEW ⭐️This garden wall had seen better days, with the old wall collapsing over time. We st...
08/09/2026

OUT WITH THE OLD, IN WITH THE NEW ⭐️

This garden wall had seen better days, with the old wall collapsing over time. We stripped it back, cleared everything out and gave it a complete rebuild using fresh new bricks. 🧱

For any enquiries give us a call 📲

🔨 Alteration works 🔨 X1 window cut out, lintel installed & window fitted  ✅X1 doorway bricked/blocked up ✅X1 door way cu...
07/09/2026

🔨 Alteration works 🔨

X1 window cut out, lintel installed & window fitted ✅

X1 doorway bricked/blocked up ✅

X1 door way cut out & lintels installed ✅

Substructure built up to DPC height ✅Floor prepped/poured ✅ Superstructure works has begun today, more pictures to follo...
24/08/2026

Substructure built up to DPC height ✅

Floor prepped/poured ✅

Superstructure works has begun today, more pictures to follow by weeks end 🏠

Ground floor open plan on this extension project ⭐️X4 steel beams installed, all bolted & fabricated to the structural e...
05/08/2026

Ground floor open plan on this extension project ⭐️

X4 steel beams installed, all bolted & fabricated to the structural engineer’s specifications. 🏗️

All first fix plumbing & electrics complete ✅

Internal stud works & plastering to follow 👀

Foundations dug/poured on our latest extension all passed by building control ready for the substructure works to begin ...
04/08/2026

Foundations dug/poured on our latest extension all passed by building control ready for the substructure works to begin 🏠

What started as standard 750mm dig all round ended up being 1.5m deep at both ends & a mass fill pour.

Lads still smashed it 👏

Any enquires don’t hesitate to get in touch 📲

21/07/2026

Brazilian slate finish ⭐️

Steels, windows & doors to follow 🏠

Couple of extensions we started a little while back x2 on the same property 🏠 Groundwork’s/drainage in, built up to DPC ...
20/07/2026

Couple of extensions we started a little while back x2 on the same property 🏠

Groundwork’s/drainage in, built up to DPC height & floors poured ✅

More pictures to follow this week 👀 📸

Address

Carlisle

Alerts

Be the first to know and let us send you an email when Ellis Developments posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ellis Developments:

Shortcuts

Share