ADR Electrical Services

ADR Electrical Services ADR Electrical Services are NICEIC Approved contractors accredited with full scope. All electrical work undertaken Domestic, Commercial and Industrial

A blast back to April 9th 1998.. Just pulled this page from a newspaper out from under some lifted floorboards, looks li...
08/06/2026

A blast back to April 9th 1998.. Just pulled this page from a newspaper out from under some lifted floorboards, looks like it had been put under some old pipework that had been leaking over a light fitting. Look at those house prices.. How times have changed.. mind you it was nearly quarter of a century ago.. where did that time go 😲

Who can say no to a little Saturday afternoon board change.. The existing unit was well past its best and the RCD was on...
06/06/2026

Who can say no to a little Saturday afternoon board change.. The existing unit was well past its best and the RCD was on its way out. Full test carried out and self cert building regulations compliance certificate all done.

An up and coming project. To Rewire the farm house and split the surrounding buildings on to a different three phase sup...
06/06/2026

An up and coming project. To Rewire the farm house and split the surrounding buildings on to a different three phase supply and meter them individually.

When one fuse board is just not enough.. This place brings back memories of engineering works / industrial estates when ...
03/06/2026

When one fuse board is just not enough.. This place brings back memories of engineering works / industrial estates when I first cut my teeth as starting working life as an electrician & mechanical engineer installing and repairing any and all sorts of electrical equipment. A time when I regularly used machines like these almost on a daily basis myself. Life has moved on and changed drastically but I still enjoy the memories these gems of places bring back. Some of these machines are decades old and still producing precision products with the skills of the people standing at them.. certainly something to be appreciated.

Canopy lighting well underway.. Taking a little longer than usual but trying to work around the garages busy hours but t...
02/06/2026

Canopy lighting well underway.. Taking a little longer than usual but trying to work around the garages busy hours but that’s no problem because I’m in and around the estate anyway working on other parts but the biggest part part of spacing the lights and fixing the bodies is done so plain sailing from now so able to start connecting them up and looking forward to seeing them illuminated.

Another couple of 3phase meters done this evening.. Soon to be starting on the other side of the industrial estate where...
02/06/2026

Another couple of 3phase meters done this evening.. Soon to be starting on the other side of the industrial estate where the submarines, switch gear and meters are to be renewed and re routed

Popped out a little earlier today to replace a faulty 3 phase, 4 wire 400 volt KWH submain meter. Over time and the year...
31/05/2026

Popped out a little earlier today to replace a faulty 3 phase, 4 wire 400 volt KWH submain meter. Over time and the years the cables had become a little stiffer and I really didn’t like how they were pressed against the sharp edges of the hole saw holes but I managed to squeeze in some grommet strip to stop them cutting through the insulation. Phase rotation checked before and after just to make sure that all the motors would still be turning in the right direction after it’s powered back up.

Finally able to get this whacking 21 kw 3 phase 400 volt 3 phase 100 % electric system boiler wired in an S plan with Hi...
26/05/2026

Finally able to get this whacking 21 kw 3 phase 400 volt 3 phase 100 % electric system boiler wired in an S plan with Hive controls.. commissioned and fully operational now the pipework is corrected ( we didn’t do the plumbing on this one 😊)

Testing a house this week I came across this.. Someone must of struggled terminating it so cut a few strands off 🤦🏻‍♂️ s...
23/05/2026

Testing a house this week I came across this.. Someone must of struggled terminating it so cut a few strands off 🤦🏻‍♂️ so what was a 10 mm cable is now less than a 5 mm cable. I have seen this many times before and after all the years I have been doing this there is very little that would surprise me but things like this make me think how do some people sleep.

Another EICR carried out little earlier this week with remedial work including fitting RCBO’s to lighting circuit within...
23/05/2026

Another EICR carried out little earlier this week with remedial work including fitting RCBO’s to lighting circuit within the bathroom and downstairs sockets. Broken socket outlets replaced, broken main switch replaced, old tarnished brass none fire rated downlights with loose open terminals replaced. Now it’s all good to go with new tenants moving in this morning.

Address

Cannock

Alerts

Be the first to know and let us send you an email when ADR Electrical Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ADR Electrical Services:

Share

Category